presented upon request from the 
authorities.

5. Start of operation

Perform the below steps every time the 
fans have been stopped.

5.1 Before start-up

Check the fans and installation location 
in accordance to the below checklist. 
Correct and improve as necessary.

Before start-up

• Safe operation

Make sure that any wire guards on 
the suction side as well as guide 
vanes on the pressure sides are 
correctly mounted.

• Clean fans

The fans must be clean and free 
from tools and objects that can 
affect the airflow.

• Electrical connections

The electrical connections must be 
correct and in accordance to the 
prescribed requirements. 
Switch the fan power briefly On, 
then Off, to verify the rotational 
direction of the rotor. Refer to the 
arrow plates on the fan casings.

5.2 Start-up procedure

Start-up procedure

1.

Start the fan.

2.

Check that no abnormal sounds and 
vibrations are present.

3.

Check that the vibration levels are 
acceptable.
See section “6.4 Vibrations”.

4.

Check that the fan operates without 
abnormal sounds and vibrations 
after 30 minutes of operation.

In the very first 30 minutes of operation, 
the motor may use more power than 
stated on the motor plate. This is the 
running-in period. The amperage 
depends among other things on the 
temperature.

The fans are designed for 
continuous operation. The 
below kinds of operation may 

cause fatigue breaks in the rotors and 
endanger people.

Operation with uninterrupted 
and repeated starts and stops

Uneven flow velocity through 
the fans

Ask Novenco if in doubt.

6. Maintenance

Keep the fans in good and operational 
condition to ensure functionality, fan life 
and warranty.

6.1 Before maintenance

Disconnect the fans from the 
electrical system, before 
initiation of any kinds of service 

on the fans. Make sure the fans cannot 
start accidentally. Fans controlled by 
automation may start suddenly, unless 
they are disconnected.
Fan units with external safety switches 
must be disconnected at the switches 
and secured, e.g. with locks. This is 
done in the fuse box or other centrally 
placed switch.

Switch off power supply for fans

1.

Locate the central fan power supply.

2.

Turn off the power for the fans.

3.

Disconnect the power supply.

4.

Lock the power switches. 
Alternatively, lock access to the 
power switches.

Service of the fans can now begin.

6.2 Intervals

Safe and proper function of the fans 
require maintenance at regular intervals. 
Faulty maintenance of fans covered by 
warranty voids the warranty.
Maintenance of the fans must include the 
following.

Maintenance checklist

• Inspection of each complete unit
• Repair and service of units
• Test of functionality

It is recommended to implement 
procedures in accordance with the above 
requirements.

6.3 Cleaning

Clean fans and silencers when needed by 
means of pressurised air or vacuum 
cleaning.

Do not use high-pressure water 
for cleaning the fans or 
silencers.

6.4 Vibrations

In the production, all fans are balanced to 
run without vibrations.
Vibrations that occur, when the fans are 
in operation, usually indicate 
accumulations of dust and dirt or foreign 
bodies on the rotor system. If ordinary 
cleaning cannot remove the vibrations, 
the fans must stay off-line and expert 
assistance be called in. Prolonged 
operation with vibrations present is 
likely to damage motor bearings and 
rotors.
Measure fan vibration velocities in 
accordance with ISO 14695 and with 
instruments that can measure Root Mean 
Square (RMS) vibration velocities. Refer 
also to ISO 13350:2015.

6.5 Motor

The fan motor is a  key component, that 
require regular service to ensure safety, 
performance and warranty.

Service the fan motor in 
accordance to the motor 
manufacturer’s maintenance 

instructions.

The motor bearings are greased-for-life 
and must be replaced according to the 
motor manufacturer’s instructions.

6.6 Motor removal

Before beginning work on the motor, 
follow the procedure in section “6.1 
Before maintenance”.
References to specific items below are to 
figure 8 on page 11, unless noted 
otherwise.

Dismounting motor

1.

Disconnect the supply cable from the 
terminal box (figure 6, item 6).

2. AUO/ARO-ARP/AUZ-AUT/ART:

 

Support the fan, remove the nuts 
from the four expansion bolts item 1 
and take down the fan.
AZT:

 Support the fan and remove the 

nuts that fasten it to the ceiling plate 
suspension bolts. Take down the fan.

3. AUO/ARO:

 Remove set screws item 

2 and dismount silencers items 03. 
Mark the silencers with tape so they 
are not mixed up.
ARP/AUZ:

 Remove set screws item 2 

Fan types

Intervals

CO-fans

Once a year

Smoke fans

Every six months

Unused fans

Every three months

Table 5.

Maintenance intervals

Содержание ARO 290

Страница 1: ...Pure competence in air ENGLISH 919044 0 NOVENCO JET FAN TYPES AUO ARO ARP AUZ AUT ART AZT INSTALLATION AND MAINTENANCE ...

Страница 2: ...e g AUO 380 160 4 Serial no Fan speed Year of manufacture Weight CE marking For smoke fans also Air performance Max temperature Working period Category or class Motor nameplate information Manufacturer information Power consumption and efficiency Voltages RPMs Weight Terminal connections Documentation and instructions from the motor manufacturer are included with the fans Refer to these when perfo...

Страница 3: ...e operational conditions and the natural frequency of the foundation and supports Follow the below guidelines to avoid resonance Soft suspension Fan is fixated through springs or dampers The natural frequency Hz of thesystemshouldbeat least20 below fan speed Soft suspensions are available from Novenco Stiffsuspension Fanisfastened to a duct or a hard surface The natural frequency of this system sh...

Страница 4: ...screws from the transport brackets in the casing 4 3 Electric connection The installation and connection to the supply network must be done by authorised personnel and according to current local legislation e g the EU standard for electromagnetic compatibility EMC Electric connection 1 Check if current legislation prescribes installation of f x an emergency stop and include this in the installatio...

Страница 5: ...he fans 3 Disconnect the power supply 4 Lock the power switches Alternatively lock access to the power switches Service of the fans can now begin 6 2 Intervals Safe and proper function of the fans requiremaintenanceat regularintervals Faulty maintenance of fans covered by warranty voids the warranty Maintenanceofthefansmustincludethe following Maintenance checklist Inspection of each complete unit...

Страница 6: ...aft Press the rotor hub to contact against the motor shaft collar Leave out use of hammers or similar as the motor bearings are sensitive to shocks 4 Use a feeler gauge to check that the blade tip clearance is the same throughout the circumference Adjust the motor position in the suspension arrangement with reference to table 7 5 Connect the cable between motor and terminal box Use same routing as...

Страница 7: ...lly safe ways and in accordance to current regulations The fans and especially the electric motors contain a wide range of materials which can all be recycled Make sure worn out motors and fan parts are disassembled and recycled for the benefit of the environment 13 Patents and trademarks Novenco and are registered trademarks of Novenco Marine Offshore A S ZerAx is a registered trademark of Novenc...

Страница 8: ...o the below directives ofthe European Council and that they comply with the below standards and regulations EU directives Ecodesign 2009 125 EU and energy labelling regulation 2017 1369 EU EMC 2014 30 EU LVD 2014 35 EU Machinery 2006 42 EU UK regulations Ecodesign for ErP 2010 and Energy Information 2011 Electrical Equipment Safety 2016 EMC 2016 Supply of Machinery Safety 2008 Applied standards AN...

Страница 9: ...otor 9 Deflector AZT Outlet cone 4 Motor 10 Suspension brackets AZT Base plate 5 Motor suspension and guide vanes 11 Wire guard 6 Terminal box 12 Centre fairing Figure 6 Main components AUO ARO ARP AUZ AUT ART AZT 10 7 6 9 4 11 1 5 3 10 8 7 5 4 1 2 3 9 1 12 9 6 10 8 6 4 1 2 3 11 7 9 6 5 11 10 1 5 2 3 4 6 7 8 9 10 1 9 5 2 12 3 4 6 7 8 1 9 10 10 11 6 5 4 11 7 3 ...

Страница 10: ...4xØR D D E 6xØR H H H Ceiling mount 2xØR Fan mount 4xØR Ceiling plate AUO ARO ARP AUZ AUT ART AZT H mm D mm E mm ØR mm AUO ARO 290 320 506 560 Ø14 M12 AUO ARO 380 420 506 720 Ø14 M12 AUO 500 540 600 830 Ø14 M12 AUZ ARP 340 422 283 520 Ø14 M12 AUT ART 340 423 779 470 Ø14 M12 AZT 280 334 417 233 Ø11 M10 AZT 355 435 500 305 Ø11 M10 AZT 450 552 610 364 Ø11 M10 ...

Страница 11: ... 14 Bolts 3 Silencers 7 Rotor 11 Guide vanes 15 Washers 4 Screws 8 Set screws 12 Rivets 16 Stiffeners Figure 8 Main components Figure 9 External terminal box and connection diagram 9 10 8 7 4 5 11 12 10 9 8 7 6 5 4 10 7 6 13 4 5 15 11 14 10 16 7 6 13 4 5 15 11 14 2 3 3 3 3 2 2 1 1 1 1 Type ARO and ARP Type AUZ Type AZT Type AUO AUO ARO ARP AUZ AUT ART AZT Motor dismoun ng AUT and ART Unit dismoun ...

Страница 12: ...ct wire guards Clean the fans Clear fans and airflow ways Replace broken parts Brief on off cycle to verify rotational direction Service the fans Brief on off cycle to verify rotational direction Start up Power on fans Troubleshooting Check for abnormal sounds and vibrations Lacking performance Measure vibrations section Vibrations on page 5 Inlet or outlet blocked After 30 min operation check for...

Страница 13: ...Pure competence in air ttt EKs E Kͳ h E KD ...

Отзывы: