background image

- 5 - 

NOVATEK-ELECTRO

                                                                                     REV-201М

     

                                                                                                                                                       

 

REV-201M complies with requirements: 

IEC 60947-1:2004, 

ІDТ

;  

ІEC 60947-6-2:1992, ІDT

;  

IEC 61000-4-2:2001, IDT

; CISPR 11:2004, IDT 

Pollutants in the amount, which is not to exceed the maximum permissible concentration are none 

 

1.3.2  Front panel view and outer dimensions are shown on figure 1.  

 

1.3.3

  REV-201M operation algorithms.  

-Energized  (Turned 

ON

)  state  of  the  REV-201M  corresponds  the 

closed

  position  of  the  output  terminals 

1-2

 

(Channel 1) and 

4-5

 terminals (Channel 2). Thus the terminals 

2-3

 (Channel 1) and terminals 

5-6

 (Channel 2) are

 

open

 when the REV-201M turned ON. 

-

 

Deenergized (Turned 

OFF

) state of the REV-201M is when terminals 

1-2

 (Channel 1) and terminals  

4-5

 

(Channel 2) are open. And accordingly when the REV-201M is in 

OFF

 state 

– then terminals 

 2-3

 (Channel 1) 

and terminals 

5-6

 (Channel 2) are closed.

 

-

 

Initialization time delay. After the power supply is given to the input terminals of the REV-201M with the initially 

preset Zero time delay settings REV-201M turns ON not momentarily but within the time of approximately 250 

milliseconds. This happens due to smooth voltage increase on the power supply source of REV-201M. 

  

 

1.3.3.1

 

“Turn ON time delay” 

 

 

Figure 2

 

– The working algorithm of relay “Turn ON time delay” 

 

Timing  countdown  on  each  channel  starts  from  the  moment  when  the  power  supply  source  is  applied  to  the 

input  terminals  «

L1-N

»

,

 

(Channel  1);  «

L2-N

»

(Channel  2).  Time  delay  setting  is  selected  using  the  knobs  of 

potentiometers 3, 5, 10, 12 (figure 1). Each channel has two adjustable knobs: 

Т1

 and 

Т2

. Time delay for the output 

contacts  triggering  of  is  determined  as  the  sum  of the  values  adjusted  by  both knobs  (T1  +  T2)  for  each  channel 
separately.  

When the power supply is present 

– 

GREEN

 LED starts glowing and timing countdown begins. After the expiry 

of time delay interval 

– 

RED

 LED turns on and the output contacts change the position to the 

ON

 state.  

 

1.3.3.2

  

“Impulse 1” operation mode 

 

 

 

Figure 3

 

– The working algorithm of relay “Impulse

 

1” 

 

Time  counting  on  each  of  the  channels  starts  from  the  moment  the  power  is  applied  to  the  termi

nals «

L1-N

», 

(Channel 1); «

L2-N

», (Channel 2). Each channel has two adjustments T1 and T2. 

When  the  power  supply  is  given 

–  on  the  channel  GREEN  LED  starts  glowing  and  countdown  begins.  Time 

delay intervals are adjusted using the knobs 

5

 and 

10

 (Figure 1.) in the diapason 

T2

 for the Channel 1 and Channel 

2 respectively 

– pause time.

 

After the turn 

ON

 time delay expiry REV-201M turns 

ON

 for the time determined by the knobs 

3

 and 

12

 (Figure 

1) in the diapason 

T1

 

– LED indicator change the color to 

RED

When the Turn 

ON

 time interval comes to an end REV-201M turns 

OFF

 the load and REV-201M switches to the 

idle mode. 

LED

 color indicator changes to 

GREEN

. A relay working cycle is restarted after recurrent de-energizing 

and reenergizing the voltage supply.

  

 

ms 

Содержание REV-201?

Страница 1: ...NOVATEK ELECTRO Ltd Intelligent industrial electronics MULTIFUNCTIONAL TWO CHANNEL TIME DELAY RELAY REV 201 OPERATING MANUAL Review the Operating manual before using the unit www novatek electro com...

Страница 2: ...PT TO REMOVE AND REPAIR THE UNIT Some of the unit components may be live NEVER ATTEMPT TO OPERATE THE UNIT WITH THE MECHANICAL DAMAGE OF THE HOUSING The unit is not designed for operation under impact...

Страница 3: ...ioning in one compact case housing 2 time delay relays in one case Mode 2 Parallel operation of the channels To each of two channels the power supply is applied simultaneously Thus the time countdown...

Страница 4: ...more then 0 150 Outer dimensions Figure1 Operation temperature range from 30 to 55 Storage temperature from 45 to 60 Arbitrary mounting position Standard 35 mm DIN rail mounting Electrical characteris...

Страница 5: ...the power supply source is applied to the input terminals L1 N Channel 1 L2 N Channel 2 Time delay setting is selected using the knobs of potentiometers 3 5 10 12 figure 1 Each channel has two adjusta...

Страница 6: ...further Note if the time interval of potentiometer 2 is equal to zero the load relay will not switch over 1 3 3 4 Control pre starting signalization operation function Figure 5 The working algorithm o...

Страница 7: ...ED of this channel is on and the time reading begins T1 T2 After delay time period the load relay switches off the LED changes the light to green and the relay turns in standby mode The restart of rel...

Страница 8: ...s mode the supply voltage of the second channel is used as the main power supply for the relay and the power input of the first channel is used as the control signal 2 GENERAL USE AND APPLICATION 2 1...

Страница 9: ...this time interval T1 the relay contacts get open and starts the timing countdown of set time interval T2 After the termination of the T2 timing countdown REV 201M starts and the process keep on work...

Страница 10: ...t is strictly prohibited to use simultaneously both power supply inputs for 24V DC and mains 230 240 VAC Only one power supply input should be used 2 2 USAGE AND OPERATION OF REV 201M Connect the powe...

Страница 11: ...shall provide a free repair of the unit within the warranty period if all the provisions of user manual were complied with by the consumer The unit shall not be subject to warranty service in the foll...

Отзывы: