![Norton Clipper C914P Скачать руководство пользователя страница 28](http://html1.mh-extra.com/html/norton-clipper/c914p/c914p_owners-manual_1709165028.webp)
28
Figure: Pulley Alignment
C914P Belt Tensioning Jam Nut Directions
7. Tighten the four (4) M10 Engine Mounting Bolts.
8. Replace the Belt Guard and replace and tighten the M10 Belt Guard
Retaining Hardware.
9. Run the machine for around 15 minutes and recheck the belt tension. If
the Belts slip under load increase the belt tension.
Remember, too much tension shortens belt and bearing life!
Check the belt tension frequently during the first day of operation. Check the
belt tension periodically thereafter and make any necessary adjustments.
Belt Alignment:
1. Review the locations of the C914P Belt
Tensioning system before proceeding. (See
Figure:
C914P Belt Tensioning System
on
page 15).
2. Remove the Belt Guard by loosening and
removing the two (2) M10 Belt Guard
Retaining Bolts.
3. Line up a straight edge along the outside
face of both pulleys. (See
Figure: Pulley
Alignment
to the right.)
4. Misalignment will show up as a gap between
the pulley face and the straight edge.
5. To correct the misalignment, move one
pulley in or out as required.
Содержание C914P
Страница 1: ...1 OWNERS MANUAL Small Concrete Saw Models C914P FORM C914P rev 8 2020...
Страница 23: ...23 B Wiring Diagram C914P GX270 Honda...
Страница 33: ...33 Depth Control Group Grupo de Control de Profundidad Groupe de Contr le de Profondeur...
Страница 35: ...35 Blade Guard Group Protector de la Hoja Grupo Groupe Blade Guard...
Страница 37: ...37 Blade Shaft and Engine Group Eje de Cuchilla y Grupo de Motores Groupe D arbre de Pale et de Moteur...
Страница 44: ...44 Water Tank Group Grupo de Tanques de Agua Groupe R servoir D eau...
Страница 46: ...46 Decals Etiqueta Autocollant...
Страница 48: ...48 Saint Gobain Abrasives 2770 West Washington Stephenville TX 76401 Phone 254 918 2310 Fax 254 918 2312...