26
3. Check belt tension by pushing up or down at the center top span of all
three of the v-belts. The v-belts should move around 3/8” to ½” (9.5 to
12.7 mm) up and down. If adjustment is needed go to step 4. If no
adjustment is required, replace belt guard and tighten all of the Belt
Guard Retaining Hardware.
4. Slightly loosen the four (4) M10 Engine Mounting Bolts with the M17
wrench. NOTE: The four (4) M10 Engine Mounting Bolts will need to
remain snug during the belt tensioning process. Not keeping the M10
Engine Mounting Bolts snug may allow the engine to twist in the
mounting slots which may result in the pulleys becoming miss-aligned.
Belt Guard
Belt Guard
Retaining
Hardware
Blade Drive
Belts
Belt
Tensioning
Hardware
Belt
Tensioning
Hardware
Engine Pulley
Blade Shaft
Pulley
Engine
3/8 to ½” (9.5 to 12.7 mm)
Up and Down Movement
Engine Mounting
Hardware one (1) Set
per Corner of Engine
Содержание C914P
Страница 1: ...1 OWNERS MANUAL Small Concrete Saw Models C914P FORM C914P rev 8 2020...
Страница 23: ...23 B Wiring Diagram C914P GX270 Honda...
Страница 33: ...33 Depth Control Group Grupo de Control de Profundidad Groupe de Contr le de Profondeur...
Страница 35: ...35 Blade Guard Group Protector de la Hoja Grupo Groupe Blade Guard...
Страница 37: ...37 Blade Shaft and Engine Group Eje de Cuchilla y Grupo de Motores Groupe D arbre de Pale et de Moteur...
Страница 44: ...44 Water Tank Group Grupo de Tanques de Agua Groupe R servoir D eau...
Страница 46: ...46 Decals Etiqueta Autocollant...
Страница 48: ...48 Saint Gobain Abrasives 2770 West Washington Stephenville TX 76401 Phone 254 918 2310 Fax 254 918 2312...