Table of Contents v
Practice 450-1011-201
Inserting the Tape Cartridge into the 1/4-shelf Disk/Tape SRU
117
Removing a Tape
118
Retensioning a Tape
119
14. Powering Up the System
121
15. Installing the Alarm System
123
16. How to Connectorize Cables
133
Connectorization Using the MI-1 Tool
133
Connectorization of DS1 Cables (CERTI-CRIMP)
135
17. Installing a -48 Vdc Power Distribution System
141
Installing a Factory-configured -48 V Power System
141
Installing the Cabinet Downgrade Kit (NT4G13AT)
150
Downgrade from Eight to Seven Cabinets
150
Downgrade from Seven to Six Cabinets
152
Downgrade from Six to Five Cabinets
152
Downgrade from Five to Four Cabinets
153
Downgrade from Four to Three Cabinets
155
Downgrade from Three to Two Cabinets 156
Installing Upgrade Kit NT4G13AU (From Two to Three Cabinets)
156
Installing Upgrade Kit NT4G13AV (From Three to Four Cabinets) 157
Installing Upgrade Kit NT4G13AW (From Four to Five Cabinets)
159
Installing Upgrade Kit NT4G13AX (From Five to Six Cabinets)
162
Installing Upgrade Kit NT4G13AY (From Six to Seven Cabinets)
163
Installing Upgrade Kit NT4G13AZ (From Seven to Eight Cabinets)
165