Installing VCE components
3-9
Installation Manual 323-3221-291 Rel 1.0 Standard
Procedure 3-3 (continued)
Connecting optical carrier facilities to a DV-OC3 unit
Step
Action
Assembling an ST connector
22
Gently insert the ferrule into the sleeve so that the guide pin enters the guide
slot, as shown in Figure 3-5.
23
Rotate the plug retainer so that the retaining pin enters the retaining groove.
24
Push the connectors together and seat the tips of the fiber cables by gently
pushing the heat-shrink cable.
25
Repeat steps 6 through 17 for the second connector. Then go to step 29.
Figure 3-5
ST connector assembly
FW-10809
Assembling an SC connector
26
Gently insert the ferrule into the sleeve so that the guide pin enters the guide
slot, as shown in Figure 3-6
27
Grasp the plug retainer and gently push it into the connector to lock it in.
28
Repeat steps 6 through 17 for the second connector. Then go to step 29.
—continued—
FW-10809
Retaining groove
Ferrule
Retaining pin
Sleeve
Plug retainer
Guide slot
Guide pin
Ferrule tip
(end face)
Содержание NT2H57UG
Страница 2: ......
Страница 14: ...1 8 Introducing a VCE Video Codec Enclosure VCE 323 3221 291 Rel 1 0 Standard...
Страница 28: ...2 14 Installing a VCE Video Codec Enclosure VCE 323 3221 291 Rel 1 0 Standard...
Страница 49: ......