Nortek Air Solutions
1502 D Quebec Avenue
Saskatoon, Saskatchewan
Canada S7K 1V7
Phone: 1-866-483-6627
Fax: 306-651-6009
Unit Identification Information
Project: __________________________________________
Model Number: ___________________________________
Serial Number: ____________________________________
Tag: _____________________________________________
Jobsite Contact: __________________________________
Job Name: _______________________________________
Job Address: _____________________________________
Telephone: _______________________________________
Email: ___________________________________________
IMPORTANT
• Complete this form for each unit and email, fax or mail to Venmar CES immediately after start-up to validate warranty
and to provide valuable information for personnel performing future maintenance or for factory assistance to address
below.
• Read the Installation, Operation and Maintenance Instructions Manual and the VHC-36, 42 and 50 DDC Controls
Package Manual (if equipped) before proceeding.
• Leave a copy of this report with the Owner and at the unit for future reference and permanent record.
• To ensure proper operation of each unit qualified personnel should perform the start-up, complete the checklist and form.
• All units are factory run tested. Blowers, heat wheel and compressors (if equipped) are set up to run correct when
power is connected. If any blower is running backwards or compressor is making loud noises disconnect power and
switch two leads (on three-phase power) to ensure proper rotation and avoid damage.
• If units are equipped with compressors, power must be turned on for 24 hours prior to a call for cooling for the com-
pressor crank case heaters to be energizing to prevent possible damage.
• The BacStat II interface module (if equipped with DDC controls package and mounted remotely) may be temporarily
connected at the unit for checkout. Ensure it is connected to the Net 2 contacts otherwise it will not give readings.
VCES-VHC-IOM-1F – VHC-36, -42 & -50
57