COMMISIONING/TESTING 

The commissioning and testing may only be 
carried out by appropriately qualified persons. 
This section should be read and fully understood 
before commencing commissioning and testing. 
 

6.1 Electrical check 

 
After completion of the installation and before 
switching on the electrical supply to the 
appliance, a preliminary check must be carried 
out by a qualified electrician. The following must 
be checked: 
 

Ensure that all cables & installer’s wiring are 
fixed to the gas pipe & that they do not touch 
the combustion collector box  

*  Check that all wiring is connected in 

accordance with the appliance circuit 
diagram; 

Ascertain that the correct fuse value and 
cable size has been provided; 

*  Check to ensure that the appliance is 

earthed by conducting an earth continuity 
test. Connect a test meter, one lead to the 
appliance earth terminal and the other to the 
mains incoming earth point at the electrical 
isolator. A resistance reading of 1,0 ohm or 
less must be indicated. If a higher reading is 
obtained, check all cable connections to 
ensure adequate security and cleanliness. If 
problem still exists, it may be necessary to 
consult the electricity supply undertaking; 

Carry out a polarity test. Connect one lead of 
a suitable AC voltmeter to earth and connect 
the other lead to the live supply terminal (L) 
at the air heater. Switch ON the power to the 
air heater and check for correct voltage. 

   The same result should be obtained by 

connecting the test leads between live and 
neutral. 

 

  Connect the voltmeter test leads to N and E. 

A reading of   0V should be obtained. If 
these tests do not conform to the above, 
there is a fault which must be rectified before 
proceeding further with the commissioning; 

Check that a suitable thermostat or control 
panel has been fitted; 

Ensure that an electrical isolator with two 
pole separation with a minimum air break 
between poles of 3,0 mm has been fitted 
adjacent to the air heater. 

 
 

6.2 Gas connection 

 
ATTENTION :  
NEVER USE A FLAME FOR CHECKING GAS 
SOUNDNESS! 
Only persons formally qualified to work on 
gas fired apparatus may carry out 
commissioning and testing. 

 
The whole of the gas service installation including 
the meter must be inspected, tested for 
soundness and purged in accordance with 
appropriate requirements by a qualified person. 
 

6.3 Suspension and support 

 
Check to ensure that the air heater is adequately 
suspended or supported and that no other parts 
have been fitted that are not independently 
supported and secured. For safe and correct 
operation, check the heater is level in both 
planes. 
 
 

6.4 Lighting the air heater 

 
VRA-4 air heaters are all fitted with automatic 
spark ignition systems. When adequate airflow for 
combustion is proven by an air proving control 
and a pre-purge period has elapsed, the integral 
ignitor and multi-functional gas control operate. 
The ignition spark ignites the gas creating the 
burner flame which is detected by a flame rod 
sensor. If a burner flame is not detected, the 
ignition controller proceeds to lock-out and 
requires manually resetting. Lock-out is indicated 
by the red warning light on the air heater. If the first 
reset is not successful, wait 15 seconds before 
attempting reset. 
 

6.4.1 To turn the air heater "ON"

 

The following checks should be carried out before 
attempting to light the air heater. 
*   Ensure that the gas supply to the air heater is 

turned ON; 

*  Ensure that the electrical supply to the air 

heater is switched 

ON; 

*  If fitted ensure that a time switch is set to an 

ON period 

*    Set room thermostat to call for heat. e.g. to above 

room ambient temperature. The burner will now 
light. 

   The burners can be seen through the viewing 

port.  

*  Adjust the room thermostat to the required 

operating comfort temperature. The air heater 
will now start automatically when heat is called 
for by the room thermostat. 

 
Note : 

If the air heater will not start on initial start-up, 

the ignition controller may be in lock-out position and 
require resetting. This may occur especially if the 
appliance has been on stand-by for a prolonged period. 

Содержание Reznor VRA-4E Series

Страница 1: ...ng Leave it with the user or attached to the appliance or gas service meter after installation WARNING Improper installation adjustment alteration service or maintenance can cause property damage inju...

Страница 2: ...ir Pressure Switch 8 7 Combustion Air Fan 9 0 FAULT FINDING p 17 10 0 PARTS LIST p 20 11 0 GAS CONVERSION p 20 12 0 USERS INSTRUCTIONS p 21 13 0 HEALTH SAFETY STATEMENT p 22 HAZARD INTENSITY LEVELS DA...

Страница 3: ...odels have an axial fan for air delivery These heaters are designed for overhead suspension and are suitable for indoor installation only installed at an operation ambient temperature between 15 C and...

Страница 4: ...pressure G20 natural gas Inlet pressure 20 0 mbar Table 2 Injector size and burner pressure G20 natural gas Inlet pressure 20mbar Table 3 Injector size and burner pressure G30 G31 butane propane Inle...

Страница 5: ...0 151 759 73 808 301 1022 479 477 82 180 608 833 212 212 123 942 550 3 4 G 120 1750 980 846 130 67 1100 164 602 177 1057 348 490 90 175 595 795 160 256 20 1365 770 3 4 G 145 1750 1150 846 130 67 1100...

Страница 6: ...r for the appropriate protection grill IP20 dia130 PN 02 25094 Each heater installed as a type C appliance must be fitted with an individual combustion air flue pipe system Only systems specified by t...

Страница 7: ...outlet socket for flue pipe 2 Combustion air inlet opening Follow any flue pipe manufacturers installation instructions for making joints including connections to the air heater for passing through a...

Страница 8: ...l modify the air throw pattern achieved In building having low heat loss where single heaters are required to cover a large floor area and in buildings with high ceiling heights air re circulation fan...

Страница 9: ...ir heater See hazard levels page 2 The heater must be installed in a level plane to ensure proper operation Figure 3 Suspension detail Add a nut to lock the M10x1 5 hanger rod to the heater 4 3 Fittin...

Страница 10: ...he appliance for long enough to ensure that lock out does not reoccur suggest 5 minutes Fix all electric cables and installer s wiring to the control panel and ensure they do not touch the combustion...

Страница 11: ...ed adjacent to the air heater 6 2 Gas connection ATTENTION NEVER USE A FLAME FOR CHECKING GAS SOUNDNESS Only persons formally qualified to work on gas fired apparatus may carry out commissioning and t...

Страница 12: ...rried out Ascertain from section 1 of this document and the appliance data plate the correct operating gas pressure for the air heater Turn the room thermostat control to its lowest setting Remove the...

Страница 13: ...onds after the burner has lit the time delay relay will activate the thermal fan control which will energize the fan motor Continue to operate the air heater for several minutes to ensure correct oper...

Страница 14: ...soot deposits from the burner with a wire brush Clean the ports with a degreaser or acetone A vacuum cleaner or compressed air may assist in this cleaning operation Wipe the inside of the burner tube...

Страница 15: ...valve 6 At the burner rack assembly remove the nuts that secure the burner manifold to the burner rack Lift the burner rack manifold assembly upward and pull the assembly out of the air heater Instru...

Страница 16: ...ontrol operating valve is the prime safety shut off All gas supply lines must be free of dirt scale etc before connecting to the air heater thus ensuring positive closure of the control valve 8 5 Comb...

Страница 17: ...7 25 FAULT FINDING Fault finding may only be carried out by appropriately qualified persons Air heater does not operate and lock out indicator light is off Air heater does not operate and lock out ind...

Страница 18: ...1712VRA 4EGBEN pag 18 25...

Страница 19: ...1712VRA 4EGBEN pag 19 25...

Страница 20: ...Gas valve modureg 120 145M 03 25144M Burner relay E 03 25321 Ignition electrode ER 03 400US 42 Ignition electrode ER 120 145 05 25186 Flame sensor electrode IS 03 401US 195292 ERP fan 12 01 27003 ERP...

Страница 21: ...lly when the room thermostat calls for heat after about 30 sec 6 If the appliance does not light a check that the burner control does not require resetting An indicator light glows at the inside panel...

Страница 22: ...suffer reddening and itching of the skin Fiber entry into the eyes will cause foreign body irritation Inhalation will cause irritation to the respiratory tract Precautions Wear protective gloves when...

Страница 23: ...tive Complies with the requirements of further directives namely GAD 2009 142 EC EMC 2014 30 EC LVD 2014 35 EC the following harmonized standards have been applied EN 1020 Non domestic gas fired force...

Страница 24: ...mum capacity pl 80 9 77 7 76 2 76 2 77 6 79 0 76 2 77 8 77 7 78 6 79 6 Envelope loss factor Fenv 0 0 0 0 0 0 0 0 0 0 0 Ignition burner power consumption Pign kW 0 02 0 02 0 02 0 02 0 02 0 02 0 02 0 02...

Страница 25: ...A United Kingdom Tel 01384 489 250 Fax 01384 487 707 reznorsales nortek com www reznor co uk Nortek Global HVAC is a registered trademark of the Nortek Global HVAC Limited Because of continuous produc...

Отзывы: