Introduction |
2
Receiving and Unpacking
1
Check packing slip to ensure ALL material has been delivered.
2
All material shortages are to be reported to NORTEC within 48 hours from receipt of goods.
NORTEC assumes no responsibility for any material shortages beyond this period.
3
Inspect shipping boxes for damage and note damages on shipping waybill accordingly.
4
After unpacking, inspect equipment for damage and if damage is found, notify the shipper
promptly.
5
All NORTEC products are shipped on a Free-On-Board (FOB) factory basis. Any and all
damage, breakage or loss claims are to be made directly to the shipping company.
Before Installation
1
Ensure that available voltage and phase corresponds with humidifier voltage and phase as
indicated on humidifier’s specification label.
2
Ensure that the dedicated external fuse disconnect is of sufficient size to handle the rated
amps as indicated on the specification label. Refer to local codes.
3
Report any discrepancy immediately to the site engineer.
4
Ensure sufficient clearances will be available as described in Location on page 11.
5
Ensure steam lines can be routed to distributor or blower pack as described in Steam Lines
and Condensate Return on page 16.
Figure 1: Specification Label Location
Содержание NH-EL Series
Страница 33: ...Installation 30 Double Unit Control Wiring Continued Figure 26 Double Unit Parallel or Sequence Wiring ...
Страница 87: ...Spare Parts 84 NH EL Plumbing Parts Figure 54 NH EL Plumbing Parts ...
Страница 89: ...Spare Parts 86 NH EL Plumbing Parts Figure 55 NH EL Plumbing Parts ...
Страница 91: ...Spare Parts 88 NH EL Electrical Parts Figure 56 NH EL Electrical Parts ...
Страница 93: ...Spare Parts 90 NH EL Electrical Parts Figure 57 NH EL Electrical Parts ...
Страница 95: ...Spare Parts 92 Blower Pack Parts Figure 1 Blower Pack Parts Figure 58 Blower Pack Parts ...
Страница 97: ...Spare Parts 94 This Page Intentionally Left Blank ...