
10-10
Page 22
2008-12-03
Figure 3. Mounting Process – Step 3
Hint
: With close space conditions we recommend to install the EPDM sealing profile to the vertical
supports before installing the supports. Please refer to step 7 for more information.
Carefully
mount the left “
D
” and the right vertical support “
E
” onto the threaded bolts of the
water tank, then fix each support with four 1/4 UNC nuts and washers (do not overtighten the nuts).
Important!
Before tightening the nuts make sure the holes of the vertical supports seat solidly
on the sheet metal of the water tub and do not stuck on the collar of the threaded bolt!
Содержание MH Series
Страница 1: ...2544832 A MH Series EVAPORATIVE HUMIDIFIER COOLER Installation Manual TM ...
Страница 5: ...10 00 Page 1 2008 12 03 10 00 INTRODUCTION ...
Страница 21: ...10 10 Page 17 2008 12 03 10 10 INSTALLATION ...
Страница 37: ...10 20 Page 33 2008 12 03 10 20 PLUMBING ELECTRICAL INSTALLATION ...
Страница 42: ...10 20 Page 38 2008 12 03 1 3 3 Wiring Diagram Nortec MH Flow Figure 7 Wiring Diagram MH Flow ...
Страница 43: ...10 20 Page 39 2008 12 03 1 3 4 Wiring Diagram Nortec MH Reflow Figure 8 Wiring Diagram MH Reflow ...
Страница 44: ...10 20 Page 40 2008 12 03 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 45: ...10 30 Page 41 2008 12 03 10 30 OPERATION ...
Страница 48: ...10 30 Page 44 2008 12 03 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 49: ...10 40 Page 45 2008 12 03 10 40 MAINTENANCE TROUBLESHOOTING ...