surface and mark locations for holes to be drilled.
Remove the panel and drill 2 holes (hole size to match
field supplied lag bolts and anchors). Place panel over
the holes and secure it using bolts.

ELECTRICAL WIRING

Electrical connections of the control panel use 18

ga wire for all external wiring. The control panel
requires 24 Vac which is provided by the NORTEC
supplied step down transformer (120 Vac to 24 Vac).
The transformer plugs into any standard 120 Vac
outlet that must be located within 6’ (six feet) of the
control panel. Power is connected to the low voltage
terminal trip located inside the panel as illustrated in
Figure #16 (“Control Panel Terminal Strip Interfaces”).
Control panels are supplied by NORTEC in two
configurations. The first is for use with systems that
are designed to operate with only an On/Off humidistat
and the second is designed to operate with a
modulation controller. Within the control panel there is
a 7 point terminal block, terminals 6 & 7 are for power
voltage 24 Vac. A wiring diagram is provided with
each control panel. Both control panels reserve
terminals 1 & 2 are for on/ off control wiring which may
be a simple humidistat, a relay for remote operation or
other interlock devices (dry make break contacts).

Modulation controlled systems use terminal 3, 4 &

5 on the 7 terminal block strip as follows: terminal 3 is
to be connected to the “+” terminal on the controller,
terminal 4 is to be connected to the “-“ terminal on the
controller and terminal 5 is for 24 Vac supply to the
controller. This is illustrated in Figure #15 (“Control
Panel Terminal Strip Interfaces”).

PILOT LINES

All air pressure lines connecting to the control

panel must be 1/4” O.D. plastic tubing suitable for 150
psig. Figure #16 (“Schematic Plumbing Layout”)
illustrates the proper connections of the air supply to
the Control Panel and from the control panel to the
vacuum valve and the pilot air regulator. The control
panel requires an input pneumatic (air) control supply
which is usually tapped off the main air supply line
upstream of the pilot air regulator. The control panel
has two pneumatic fittings located on its top plate; one
marked “pilot in” and the other marked “pilot out”. The
“pilot in” gets connected to the control supply with the
1/4” plastic tubing. A second 1/4” line connects the
“pilot out” to both the pilot air regulator and the vacuum
valve using a “T” connector.

- 10 -

PRV

-P

ILOT

PRV

PRV

Primary Water Pressure Control

Primary Air Pressure Control

Ball Valve

Ball Valve Water Side

Vacuum Valve

Pilot Air Regulator

Nozzle

Pilot Line

Control

Panel

Single Zone Configuration

Figure #16

Schematic Plumbing Layout

1

2

3

4

5

7

6

24 Vac

On/Off
Controls

Modulation

Input

Optional

24 Vac

- +

Figure #15Control Panel Terminal Strip Interfaces

Содержание AIRFOG

Страница 1: ...omizing Humidifiers Installation Operation Maintenance Spare Parts and Exploded Views Guide IMPORTANT Read and save this guide for future reference This guide to be left with equipment owner FORM 04 217 1502247 ...

Страница 2: ...NSTALLATION 3 NOZZLE SYSTEM LAYOUT 3 ZONES 6 SUPPLY AND FEED LINES 6 CLEANING 6 MOUNTING OF NOZZLES 6 CONNECTING NOZZLES 7 SADDLE CLAMP INSTALLATION 7 VACUUM VALVE 7 PILOT OPERATED AIR REGULATOR 8 PRIMARY AIR PRESSURE CONTROL SECTION 9 PRIMARY WATER PRESSURE CONTROL SECTION 9 CONTROL PANEL 9 ELECTRICAL WIRING 10 PILOT LINES 10 AFE SELF CONTAINED AIRFOG SYSTEMS 11 AFE MINI SYSTEMS 11 AFE OCTO SYSTE...

Страница 3: ...OCEDURES 16 SHORTENED SHUT DOWN PROCEDURE 17 MAINTENANCE 17 SPARE PARTS 18 SEASONAL MAINTENANCE 18 SEASONAL STARTUP PROCEDURE 18 UNSCHEDULED MAINTENANCE 18 VACUUM VALVE TESTING 18 CHECKING FOR VACUUM LEAKS 19 TROUBLESHOOTING 20 ...

Страница 4: ... FIGURE 11 PILOT AIR REGULATOR INSTALLATION 9 FIGURE 12 PRIMARY AIR PRESSURE CONTROL SECTION 9 FIGURE 13 PRIMARY WATER PRESSURE CONTROL SECTION 9 FIGURE 14 AFE CONTROL PANEL INTERFACES 9 FIGURE 15 CONTROL PANEL TERMINAL STRIP INTERFACES 10 FIGURE 16 SCHEMATIC PLUMBING LAYOUT 10 FIGURE 17 MINI INSTALLATION 11 FIGURE 18 PLUMBING END CONNECTIONS 11 FIGURE 19 OCTO LAYOUT AND INTERFACES 12 FIGURE 20 OC...

Страница 5: ...M VALVE ADJUSTMENT 16 CHART 2 AFE CAPACITY CHART 16 TABLE 1 CLEANING TIMER SWITCH SETTINGS 17 TABLE 2 REBUILD KITS 20 FIGURE 25 OCTO EXPLODED VIEWS 21 FIGURE 26 NOZZLES EXPLODED VIEWS 23 FIGURE 27 VACUUM VALVE EXPLODED VIEWS 24 FIGURE 28 CONTROL PANEL EXPLODED VIEWS 26 ...

Страница 6: ...reasing air pressure will increase the vacuum pressure and hence more water is siphoned into the nozzle As the water exits the nozzle it is broken down into a fine mist by a shearing action Increases in air supply pressure also means that the exiting mixed flow is at a higher velocity Since AFE nozzle systems use a zero psig water pressure feed network the water feed system and nozzles must be hor...

Страница 7: ...G SYSTEM COMPONENTS This document is applicable to all NORTEC AIRFOG system components purchased after February 2004 If the designer has access to system components purchased prior to February 2004 the Axair Nortec Technical Service Department should be consulted to determine compatibility with the newer equipment parts and external interfaces INSTALLATION TOOLS AND EQUIPMENT The Designer should h...

Страница 8: ...r structures should be drawn on the floor plans The proper selection and location of the nozzles is very dependent upon these obstructions Figure 1 Typical Nozzle Layout can be used as a guide for identifying the various components used with a system The supply and feed lines for the system should be kept in straight unobstructed lines where possible Air and water distribution network pipes are to...

Страница 9: ... Piping Type L or Rigid Plastic Piping by others 1 4 Polytube Control Lines Humidistat 24 Vac Transformer Control Panel Main Air Primary Air Pressure Control Section Optional Pilot Operated Air Regulator Vacuum Valve Pilot Water Regulator for AFU System Air Water Wall Bracket Supplied by NORTEC Figure 1 Typical Nozzle Layout ...

Страница 10: ... Primary Water Pressure Control Primary Air Pressure Control Ball Valve Ball Valve Water Side Vacuum Valve Pilot Air Regulator Nozzle Pilot Line Pilot regulator used to boost pilot control signal to the four zones Tap off main supply Air line use min 3 8 I D copper or plastic line Main Air Supply Figure 2 Multi Zone Layout ...

Страница 11: ...tings to the pipe CLEANING Clean out valves must be installed at the ends of all lines to facilitate cleaning and drainage of lines Cleaning is done by temporarily connecting the pipes to a compressed air source at one end of the pipe The other end of the pipe must not be connected to any equipment but be free to allow the egress of foreign matter Care must be taken to protect personnel animals ma...

Страница 12: ...to place using the provided screws The saddle clamp has a 1 8 FNPT port install either the supplied compression fitting or another style fitting suitable for plastic tubing Two saddle clamps one for air and one for water are required for each nozzle NOTE Not to be used with DI water NOTE For DI water use stainless steel tee VACUUM VALVE The vacuum valve must be centrally located so there are appro...

Страница 13: ... on each of its two sides This permits the nozzle to draw water from the supply as it is required rather than having pressure force it into the nozzle This siphoning action of the nozzle is controlled by the pilot operated air regulator On top of the vacuum valve is a thumb wheel adjustment for adjustment of the AIRFOG droplet size The adjustment changes the availability of water to the nozzles Th...

Страница 14: ...utoff valve end of section is the inlet The gauge end of the section is joined to the water inlet of the vacuum valve for AFE systems See Figure 13 Primary Water Pressure Control Section CONTROL PANEL Bolt the panel directly to the surface through the mounting holes Place the panel level against the 9 1 2 NPT Brass Union 1 2 NPT Brass Union 1 2 FNPT 1 2 FNPT Brass Y Type Strainer 1 2 NPT Pressure ...

Страница 15: ...tems use terminal 3 4 5 on the 7 terminal block strip as follows terminal 3 is to be connected to the terminal on the controller terminal 4 is to be connected to the terminal on the controller and terminal 5 is for 24 Vac supply to the controller This is illustrated in Figure 15 Control Panel Terminal Strip Interfaces PILOT LINES All air pressure lines connecting to the control panel must be 1 4 O...

Страница 16: ...ounting bracket hardware or bolt panel directly onto the wall surface via the mounting holes Place the panel level against the surface and mark the drill holes Remove the panel and drill the holes hole size to match field supplied lag bolts and anchors Replace the panel and secure using bolts Install water and air supply lines Both water and air lines should have an isolation valve installed near ...

Страница 17: ...ons Prior to mounting check the proposed location and ensure there are no obstacles such as duct work lighting large equipment or other obstacles within the perimeter spray area of the unit Figure 20 Octo Spray Pattern illustrates this restraint The Octo unit should be installed as high as possible above the floor any equipment or work space Adiabatic cooling is often uncomfortable to people occup...

Страница 18: ...re 23 Four Octo Units With A Single Control Panel If more than four Octo s are to be controlled from one control panel use a pilot air regulator or a volume booster for the pilot line Octo Plus units do not require a separate control panel as there is one mounted within the unit All that is necessary is to connect it electrically as explained on page 10 of this manual under Electrical Wiring Contr...

Страница 19: ...ce and the control panel power indicator light is illuminating The humidistat is set at 100 relative humidity COMPRESSED AIR SUPPLY The clean out valves on the ends of the supply pipes must be closed The on off valve of the primary air pressure control section is opened to the ON position The handle should be in line with the pipe as opposed to 90 degrees to it The control panel switch is turned t...

Страница 20: ...rt 1 Capacity Output vs Vacuum Valve Adjustment Chart 2 AFE Capacity Chart Adjustment of the thumb screw on the vacuum valves done by turning the adjustment wheel on top of the vacuum valve clockwise the water flow rate can be decreased until there is a fine spray pattern from the nozzles Some experiments adjusting this valve will produce an optimum look and feel of the spray pattern The finer the...

Страница 21: ...r can be secured and the locking nuts on the primary air and water regulators can be tightened AIRFOG SYSTEM SHUT DOWN PROCEDURES Controlled system shutdowns are conducted for either maintenance scheduled or repair or long term seasonal reasons If the shutdown is for short term maintenance then it may be possible to shorten this full procedure The following procedures are the recommended method to...

Страница 22: ...ctivity normally conducted in the repair workshop which consists of disassembly of system parts so that repair kits can be used to return parts to the operational spare category The two most probable maintenance problems are The accumulation of dirt and mineral deposits in on the nozzle Air and water leaks that may be due to marginal workmanship during installation but not obvious until after many...

Страница 23: ...e Shut Down section of this guide Each nozzle shall be cleaned of mineral water deposits and accumulated dirt using the procedure described in the Maintenance section of this guide Each nozzle should be lubricated using a silicone based lubricant The compressor manual should be consulted for its recommended seasonal maintenance SEASONAL STARTUP PROCEDURE A detailed visual inspection of all air and...

Страница 24: ...ce the control panel pressure to 40 psig Adjust thumb wheel tension by turning it in a clockwise direction There should be a visual difference in the output of the nozzles as more tension is applied to the spring Be sure not to press down on the thumb wheel while turning it Release the thumb wheel tension and once again there should be a noticeable change in the nozzle output The spring tension of...

Страница 25: ...r pressure Repair Stuck Closed Or Open Unable to adjust pressure Disassemble and clean Pilot Water Regulator Damaged Diaphragm Loss in water pressure No water pressure Uncontrolled water pressure Repair Stuck Closed Or Open Unable to adjust pressure Disassemble and clean Solenoid Valve Burnt Coil Valve does not activate Replace Blocked No pressure leaving the valve Clean Stuck Closed Or Open Dirty...

Страница 26: ... 21 0 5 1 0 1 5 2 0 2 5 30 T OFF T ON H M x 1 H M x 1 1 2 3 4 5 6 1 2 3 4 5 6 7 8 9 10 11 12 9 13 14 18 17 16 19 20 21 9 22 15 23 16 24 25 Figure 25 Octo Exploded Views ...

Страница 27: ... 11 160 3021 Pilot Lamp Assembly 0 0 0 1 1 1 12 160 3006 Plastic Panel Nut 0 0 0 1 1 1 13 160 3001 Regulator Air Panel Mount 0 0 0 1 1 1 14 160 3050 Repeat Cycle Timer 0 0 0 1 1 1 15 160 3051 Mount For Timer 8 Pin Socket 0 0 0 1 1 1 16 160 5208 Bulkhead Union 1 4 T 1 1 1 2 2 2 17 160 5241 Fttg Plastic Union Tee T 0 0 0 1 1 1 18 160 5242 Fttg T Stem AD T 1 4 NPT 0 0 0 1 1 1 19 160 5243 Fttg Plastic...

Страница 28: ...Cone 1 2 160 4009 O Ring Seal 2 3 160 4001 AFE Body 1 4 160 4008 Flat Washer 2 5 160 4038 Retaining Clip SST 2 6 160 4124 O Ring Valve Seat 1 7 160 4011 Piston Seal 1 8 160 4003 AFE End Cap 1 9 160 5202 Swivel Male Elbow 2 10 160 4010 Rod Seal 4 11 160 4040 Cleaning Needle 1 12 160 4039 Piston 1 13 160 4036 Spring 1 ...

Страница 29: ... 18 12 13 14 13 15 17 16 18 19 10 20 21 22 0 5 1 0 1 5 20 2 5 3 0 Octo Vacuum Valve Mini Vacuum Valve Vacuum Valve 1 2 3 4 5 6 7 8 21 9 22 19 20 28 10 14 13 12 24 15 17 11 18 17 29 15 25 25 26 10 14 13 12 27 16 Figure 27 Vacuum Valve Exploded Views ...

Страница 30: ... 1019 Fttg Nipple 1 4 NPT hex x 1 0 0 1 160 1044 Fttg Nipple 1 4 NPT hex x 1 Plastic 0 0 1 14 160 3008 Pressure Gauge 1 1 2 1 8 CB 0 30 1 1 1 15 160 4022 Valve Body 1 1 1 16 160 4023 Valve Seat 1 1 1 17 160 4122 O Ring Body Valve 118 2 2 2 18 160 5217 Fttg 3 8 T 1 4 NPT 1 0 3 19 160 4028 Bolt 1 4 x 2 UNF 6 6 6 20 160 4029 Nut 1 4 c w star washer 6 6 6 21 160 4031 O Ring 1 1 1 22 160 4032 Bracket W...

Страница 31: ... 26 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 17 19 20 21 22 23 24 26 28 29 3 10 30 27 25 16 Figure 28 Control Panel Exploded Views ...

Страница 32: ...160 3050 Repeat cycle timer 1 1 13 160 7043 Control panel door 1 1 14 160 3200 Pressure gauge panel mtg bars 1 1 15 149 3096 Lamp green indicator 1 1 16 145 3001 Switch on off 1 1 17 160 3023 Lamp amber indicator 1 1 19 160 3006 Plastic panel nut 1 1 20 160 3062 Valve 3 way 24 Vac solenoid 0 1 21 160 3001 Regulator panel mount air 1 1 22 160 5202 Fitting swivel male elbow 4 3 23 160 3051 Mount for...

Страница 33: ... by law No liability whatsoever shall be attached to THE COMPANY until said products have been paid for in full and then said liability shall be limited to the original purchase price for the product Any further warranty must be in writing signed by an officer of THE COMPANY THE COMPANY s limited warranty on accessories not of AXAIR NORTEC s manufacture such as controls humidistats pumps etc is li...

Страница 34: ...nc P O Box 698 826 Proctor Avenue Ogdensburg NY 13669 Tel 315 425 1255 e mail nortec humidity com Axair Nortec Ltd 2740 Fenton Road Ottawa ON K1T 3T7 Tel 613 822 0335 Fax 613 822 7964 A WMH COMPANY PRINTED IN CANADA ...

Отзывы: