background image

11

Step

Installation Procedure(ex. @Garage)

Necessary Tool

4 Grab

 Bag Labeled "Step-1" 

for this step of the installation.

Measure 

"

B-Vent" 

Diameter

Installation for 3" or 4" where 

"

B-Vent"

 does not come down through the ceiling. 

      Remove the four screws from 

"

A Base Junction Adapter"

      Place and center 

"

A Base Junction Adapter"

 (Lower side) over the opening of 

 

      

      ceiling. 

       

      Attach 

"

A Base Junction Adapter"

 with four screws (must be field supplied) to the ceiling. 

 

 

 

 

 

 

 

 

Installation for 4" 

"

B-Vent" 

     Insert 

"

A Base Junction Adapter"

 onto the 

4" "

B-Vent"

 

     Attach 

"

A. Base Junction Adapter"

 with two 

"

B Screws"

 from 

outer pipe of  

     

"B-Vent"

.

 

 

 

 

5 Insert 

"

Base Junction Support" 

to the bottom of

 "

B-Vent" 

that is sticking out 

from the ceiling or 

"

A. Base Junction Adapter"

. Firmly tighten 

"

Base Junction 

Support"

 with 

"

A. B-Vent Clamp"

, be careful not to over tighten, this may distort the 

rubber. Check to see if it secure by pulling by hand.

     

The tightening torque should be between 7 and 10 in lb.

Base Junction 

Support

If strength of the ceiling is not sufficient (i.e. plasterboard), take appropriate 

measures to ensure safe installation.

Be sure to do

A  Base Junction 

Adapter

B  Screws

Phillips Head 

Screwdriver

Installation for 4" B-Vent

Installation for 3" B-Vent

Installation for no B-Vent 

Protruding

NO USE

NO USE

Use appropriate screws

for the ceiling.

(must be field supplied.)

Mpxfs!Tjef

Flat head

Screwdriver

Box wrench

(5/16")

or

10

Step

Installation Procedure(ex. @Garage)

Necessary Tool

1 Remove the B-Vent between bottom of ceiling and tank type water heater.

2 Drain and remove the tank type water heater.

3 Use a measuring tape to measure from the bottom of  the 

"

B-Vent" 

to the roof 

termination to get the total length of the vent run. 

     

The Measured vent run length will be used in procedure No. 23 later. Make a note 

         of the Vent Run Length.

Tape Measure

Step-1

(W

ork where equipment is installed)

Approx.4 feet/round

4ft

8ft

12ft

16ft

20ft

:

:

Side view of flex

vent coil

Содержание EZ2FVK-1

Страница 1: ...n may result causing property damage personal injury or death Do not install only with the EZTR Start up Guide Read this manual also before installation Requests to Installers This manual is for the v...

Страница 2: ...model manufactured by others Flex Vent 2 Kit can be installed at zero clearance to combustible materials Appliances can be started up immediately after Flex Vent 2 Kit is installed and inspected Flex...

Страница 3: ...support 1 Universal Rain Cap 1 Bag Step 3 Rigid 45 Elbow SET 1 Flex 2 Vent Gasket 1 Fastening Screws 2 Aluminum tape 1 Part Shape Q ty Installation Manual This document 1 EZTR 25 Feet Start Up Guide 1...

Страница 4: ...pt under these following conditions Clean and dry place Above 40 F 5 Keep out of direct sunlight Minimum bend radius should be more than 7 inch Handle the flexible vent carefully Dropping Crushing and...

Страница 5: ...ollowing items are OK Can be installed before installation If all items are OK Can be installed proceed to the next step 6 Installation Check point Can be installed OK Cannot be installed NG Mark if e...

Страница 6: ...ent diameter 3 or 4 5 or larger 5 Horizontal distance between B Vent connection from the ceiling and the unit is no more than 5ft 5ft or less More than 5 ft 6 Vent length from the top of unit to the r...

Страница 7: ...ot be installed NG Mark if each condition is matched 7 Ambient temperature where unit is installed More than 40 5 40 5 or less Refer to page 4 8 Accessibility to Rain Cap Can access Rain Cap Cannot ac...

Страница 8: ...rectly and safely The numbers before the names of the components are corresponding to the same component names as in step 6 Installation Flex Sleeve Base Junction Support Flex Pipe 2 Top Flex Support...

Страница 9: ...ou need more than 25 feet of Flex pipe contact Noritz America 1 866 766 7489 Max allowable 45 degree elbows B Vent are 2 elbows Not including Rigid 45 Elbow Set No 90 elbows B Vent Only when the all c...

Страница 10: ...er heater 3 Use a measuring tape to measure from the bottom of the B Vent to the roof termination to get the total length of the vent run The Measured vent run length will be used in procedure No 23 l...

Страница 11: ...of B Vent 5 Insert Base Junction Support to the bottom of B Vent that is sticking out from the ceiling or A Base Junction Adapter Firmly tighten Base Junction Support with A B Vent Clamp be careful no...

Страница 12: ...straight B Vent runs Flex Feeder prevents debris from falling into the Flex Pipe 2 Be sure to do When pushing Flex Pipe 2 through the B Vent if there is unusual feeling touching the bump of screw etc...

Страница 13: ...below Step 2 Procedure 9 14 Use this Image to check for correct assembly of the components 9 Grab Bag Labeled Step 2 and necessary tools for this step of the installation Climb up on the roof and acc...

Страница 14: ...r to mark the original position of the Flex Pipe 2 at B Vent s upper tip Marker 12 Slide in the Top Flex Support to the Flex Pipe 2 Top Flex support Mark is very important for the function Do not skip...

Страница 15: ...p All cuts must be made at right angle to the pipe All field cuts must be deburred Take precaution not to drop debris into Flex Pipe 2 In case debris is dropped remove from the lower end of the Flex P...

Страница 16: ...L shown below Follow the below chart and install accordingly Equipment installation upper limit height chart by horizontal distance Horizontal distance L 0 1 2 3 4 5 More than height H 2 2 2 2 6 3 3 P...

Страница 17: ...ppropriate length Marker Point If it interferes with water and hot water piping adjust Rigid 45 Elbow Set s angle so that it does not interfere If the contact is unavoidable take measures such as inse...

Страница 18: ...he below figure Point When determining the cut length take note on the 2 points listed below Point Determine the proper length not giving too much tension to both Base Junction Support and Rigid 45 El...

Страница 19: ...eeds to be cut it should be cut while in its compressed state 19 Firmly tighten B Flex Sleeve Clamp of Base Junction Support but be careful not to tighten too much as it may distort the Flex Sleeve an...

Страница 20: ...vely locked to the equipment s vent connector pipe Insert the Flex Pipe 2 from the previous procedure into the Rigid 45 Elbow Set Rigid 45 Elbow Set Step 3 Work where equipment is installed Make sure...

Страница 21: ...edure No 3 in addition to the distance from the water heater Calculate the total vent length to determine the dip switch setting Vent length X total length of B Vent measured in procedure No 3 Y the d...

Страница 22: ...crews Aluminum tape Step 3 Work where equipment is installed Pay attention not to get injured from the sharp edge of Flex Sleeve WARNING Point Check and see if Flex Sleeve is firmly fixed 7 Maintenanc...

Страница 23: ...URC 1 Top Flex Support for EZ2FVK EZ2FVK TFS 25 Feet Flex Pipe 2 LE EZ2FVP25 1 Base Junction Adapter Set EZ2FVBJADS 1 Base Junction Support w o hole EZ2FVBJS 1 Flex Vent 2 Sleeve EZ2FVS Flex Vent 2 Ri...

Страница 24: ...Flex Feeder LE EZ2FVF 1 Flex Vent 2 Kit 25 Feet Installation Manual This document EZ2FVK 1 LT EZTR 25 Feet Start Up Guide EZ2FVK 1 SUG Packing Box for Flex Vent 2 Kit 25 Feet EZ2FVK 1 BOX No indicate...

Отзывы: