11
IMPORTANT:
When the top section of the
roof jack is removed for transit, a special warn-
ing label must be attached adjacent to the fuel
line connection of the gas or oil burner. The
special warning label is suppled with two piece
roof jack assemblies.
Chimney Installation
When venting the CMF through an existing
chimney, the materials, sizing, and installation
of the chimney must be in accordance with the
ANSI Z223.1/NFPA 54, (National Fuel Gas
Code), ANSI/NFPA 31(Installation of Oil Burn-
ing Equipment), NFPA 211 (Chimneys, Fire-
places, Vents, and Solid Fuel-Burning Appli-
ances) and all applicable local codes. The
materials used must be capable of withstanding
exposure to temperatures of at least 700°F .
The CMF power gas units are fan-assisted.
Installation of Ventilaire III or IV Air
Quality Package (Accessory)
The Ventilaire air quality packages are available
to meet the ventilation requirements as outlined
VENT PIPE
3 FEET MIN.
ROOF JACK ASSY.
ROOF CAP ASSY.
FLEX DUCT
CEILING TRIM COLLAR
CONNECTOR
DRAW BAND
DRAW BAND
FURNACE
Figure 10. Typical Installation
FURNACE
CAUTION
MAINTAIN 2 1/2" MINIMUM CLEARANCE
BETWEEN FLUE PIPE AND FLEX DUCT.
FAILURE TO COMPLY WITH THIS
RESTRICTION COULD CAUSE
EQUIPMENT DAMAGE. VENTILAIRE III
ILLUSTRATED OTHER LISTED
VARIATIONS AVAILABLE. CHECK WITH
MANUFACTURER.
VentilAire III
VentilAire IV
Figure 11. VentilAire III and IV
Содержание CMF 100-PG
Страница 27: ......