Nordson EcoDry
r
Series Induction Dryers with Touch Screen Controls
12
Part 1601306
−
02
E
2014 Nordson Corporation
Coil and Tube Installation
See Figure 8. Install the coil and glass tube as follows:
1. Remove the screws securing the rear access panel with a hex wrench.
2. Remove the screws (1) securing the air heater and exhaust vent to the
entrance and exit hubs. Move the air heater and exhaust vent away
from the hubs.
3. Remove the slotted nylon screws (2) from the entrance and exit hubs.
4. Unpack the coil and tube. Carefully insert the glass tube (3) through
the coil (4).
5. Carefully install the coil and tube assembly in the coil tray, positioning
the ends of the tube into the hubs. It does not matter which end of
the coil is at the entrance or exit unless the coil is marked with the
flow direction.
6. Re-install the two nylon slotted screws into the entrance and exit hubs.
7. Route the coil wires through the hole that has a grommet and is located
in the bottom of the coil tray.
8. Re-install the heater blower and exhaust vent on the entrance and
exit hubs.
9. Connect the coil wiring to the bus bar terminals (5) (no polarity).