7
3. If there is a shipping support attached to the
Front of the Frame (1), remove the screws from
the shipping support, and discard the screws
and the shipping support.
With the help of another person, place some
packing inserts from the packing material under
the Frame (1) so that the Frame is lifted off the
floor.
Attach the Front Stabilizer (73) to the Frame
(1) with two M10 x 120mm Screws (84). Then,
remove the packing inserts and lower the Front
Stabilizer.
3
4. With the help of a second person, lift the Upright
(2) upward into the upright position.
See the inset drawing. Tighten the Upright
Knob (85) into the Upright (2).
4
1
84
73
2
85
2
Содержание SpaceSaver SE5i
Страница 4: ...4 all STANDARD SERVICE PLANS...
Страница 22: ...22 NOTES...