
17
7
Position Sensor Installation
1.
The position sensor (E06) should be mounted such that the largest amount of travel of the
sensor can be utilized without exceeding the travel limit. The sensor install length is 17”
(430mm) center to center with ±3.5” (±90mm) travel recommended. It should be mounted
with the cable on the bottom in a location where the sensor will not bind or contact. Roll
the boom fully in each direction and take measurements to ensure the travel limit is not
exceeded.
Figure 12: Position Sensor Mounting
2.
Mount the position sensor to the brackets using the mounting hardware as shown in
Figure 13
.
Figure 13: Mounting Hardware
Collar
Bolt
Nut
Nut
Содержание UC5 Topcon X30
Страница 1: ...John Deere R Series Active Wing Roll Control Installation Manual JD12A ...
Страница 7: ...4 4 Kit Parts 4 1 Kit Overview Figure 2 JD12A System Parts ...
Страница 8: ...5 4 2 Hydraulic Plumbing Figure 3 JD12A Hydraulic Plumbing ...
Страница 25: ...22 Figure 20 Valve Block Solenoid Locations ...
Страница 29: ...26 Figure 23 Load Sense Bleed Orifice Location on Top of Block Remove this coil ...
Страница 44: ...41 12 3 ITEM C03 43220 03 CABLE UC5 NETWORK 14 AWG 3M 12 4 ITEM C05 43210 20 CABLE UC5 NETWORK 18 AWG 20M ...
Страница 45: ...42 12 5 ITEM C10 43230 04 CABLE UC5 VALVE DT TO DT ...
Страница 46: ...43 12 6 ITEM C20 43240 41 CABLE UC5 INTERFACE TILT DT R4038 ...
Страница 47: ...44 12 7 ITEM C21 43240 38 CABLE UC5 INTERFACE JOHN DEERE R4030 4038 ML ...
Страница 48: ...45 12 8 ITEM C30 43250 07 CABLE UC5 BATTERY JD FUSED ...