Pre-Install Checklist
The pre-install checklist is necessary to check the existing sprayer functionality before the
installation.
1.
Unfold the sprayer over a flat, unobstructed area (i.e. no power lines…etc.).
2.
Ensure all boom-fold operations are functional (place a check mark in boxes below).
3.
Bring engine to field-operational RPM and record below.
4.
Record the time (seconds) it takes for a full stroke for all boom functions. To ensure
repeatable measurements, take the average of 3 trials.
5.
Not all sprayers will have the functions listed below in
Figure 4
.
Ensure the boom has sufficient travel so it does not contact the ground during
these tests.
Figure 4: Pre-Install Boom Speeds
Содержание UC5 Topcon X30
Страница 1: ...John Deere R Series Active Wing Roll Control Installation Manual JD12A ...
Страница 7: ...4 4 Kit Parts 4 1 Kit Overview Figure 2 JD12A System Parts ...
Страница 8: ...5 4 2 Hydraulic Plumbing Figure 3 JD12A Hydraulic Plumbing ...
Страница 25: ...22 Figure 20 Valve Block Solenoid Locations ...
Страница 29: ...26 Figure 23 Load Sense Bleed Orifice Location on Top of Block Remove this coil ...
Страница 44: ...41 12 3 ITEM C03 43220 03 CABLE UC5 NETWORK 14 AWG 3M 12 4 ITEM C05 43210 20 CABLE UC5 NETWORK 18 AWG 20M ...
Страница 45: ...42 12 5 ITEM C10 43230 04 CABLE UC5 VALVE DT TO DT ...
Страница 46: ...43 12 6 ITEM C20 43240 41 CABLE UC5 INTERFACE TILT DT R4038 ...
Страница 47: ...44 12 7 ITEM C21 43240 38 CABLE UC5 INTERFACE JOHN DEERE R4030 4038 ML ...
Страница 48: ...45 12 8 ITEM C30 43250 07 CABLE UC5 BATTERY JD FUSED ...