
24
16.
Route the CAN Node cable (
C02B
) to
the roll sensors which are installed in
Section 4.4
. Follow existing cables
and/or hydraulic lines.
17.
Connect the 4-pin AMP connectors to
the roll sensors.
18.
Connect the sensor branch cable (
C02
)
to the 4-pin AMP plug on
C02B
(
Figure 28
).
19.
Route the sensor branch cable (
C02
) to
the wing and main sensors and connect
to the sensors. Follow existing cables
and/or hydraulic lines along the boom.
20.
Cable-tie the installed cables every 12
inches.
IMPORTANT:
Provide enough slack in all cables to
account for the movement of the
main section, parallel lift, and
FOLDING boom movement.
Figure 28 – Cable Configurations: C11, C02 and C02B
Содержание UC4+ Hardi OEM
Страница 9: ...6 Figure 3 Hydraulic Components Double Acting Figure 4 Hydraulic Components Single Acting ...
Страница 20: ...17 Figure 19 Roll Sensors Mounted on an SPC Eagle Boom Chassis Roll Boom Frame Roll Sensor ...
Страница 30: ...27 5 3 ITEM C03 44656D CABLE VALVE VARIABLE RATE DT ...
Страница 31: ...28 5 4 ITEM C10 44650 35 POWER GENERIC CABLE PULL TYPE ...
Страница 32: ...29 5 5 ITEM C11 44651 03 VALVE EXTENSION GENERIC CABLE ...
Страница 33: ...30 5 6 ITEM C12 44658 42 INTERFACE CABLE AMP ML ONLY ...
Страница 34: ...31 5 7 ITEM C13 44658 60 BYPASS INTERFACE CABLE AMP ...
Страница 35: ...32 5 8 ITEM C16 44658 49 VALVE CABLE ROLL PIGTAIL ...