24
4.8.3 Hydraulic Plumbing
WARNING!
From this point in the installation the
booms will be inoperative until the
electronics are fully installed.
1.
After the NORAC valves are mounted,
the hydraulic hoses and fittings can be
plumbed. The plumbing for the
hydraulic circuit is shown schematically
in
Figure 3
.
2.
Connect the NORAC supplied hoses
(
H03
) to the Pressure (P) and Tank (T)
ports on the NORAC valve block (
V01
).
Route both of these lines to the sprayer
valve block.
3.
Connect
H03
to the auxiliary Pressure
and Tank ports available on the side of
the sprayer valve block (
Figure 30
) with
the 10MB-6MJ couplings (
F04
).
4.
The existing hoses that run to the boom
tilt cylinders should be disconnected
from the sprayer valve block and the
cylinders.
5.
Connect NORAC supplied hoses
between the cylinders and NORAC
valve block.
Items H04
are for the left
boom cylinder.
Items H05
are for the
right boom cylinder.
a.
The “raise” lines from the side of the
boom tilt cylinders, which raise the
booms, must be connected to the "B"
ports of the NORAC valve block.
The ports on the sprayer block must
then be plugged/capped with
Item
F03
.
b.
The "A" ports of the NORAC block
must be connected to the “lower”
lines of the cylinders.
Figure 30 – Auxiliary Pressure and Tank Connections
P
ressure and Tank
Connections
Содержание Gregson Maverick 120 Series
Страница 9: ...7 Figure 3 Hydraulic Components ...
Страница 14: ...12 Figure 9 Sensor Serial Number Installation Location 3 SENSOR SYSTEM 5 SENSOR SYSTEM ...
Страница 32: ...30 5 3 ITEM C02B 44664 CABLE UC4 CAN NODE DUAL 5 4 ITEM C03 44656 VALVE CABLE VARIABLE RATE ...
Страница 33: ...31 5 5 ITEM C04 44651 VALVE EXTENSION CABLE ...
Страница 34: ...32 5 6 ITEM C10 44650 11 POWER CABLE GREGSON MAVERICK ...