23
If using bolts, the bolts should
thread into the valve block at least
3/8". The valve mounting holes
are drilled and tapped 3/8 NC-1"
deep. The rule of thumb for bolt
length is 1-1/2" longer than the
tube size.
You must ensure no hydraulic
components will interfere with any
sprayer parts or be pulled tight at
any time.
Figure 28 – Valve Mounting Location
Figure 29 – Valve Mounting Example
Содержание Gregson Maverick 120 Series
Страница 9: ...7 Figure 3 Hydraulic Components ...
Страница 14: ...12 Figure 9 Sensor Serial Number Installation Location 3 SENSOR SYSTEM 5 SENSOR SYSTEM ...
Страница 32: ...30 5 3 ITEM C02B 44664 CABLE UC4 CAN NODE DUAL 5 4 ITEM C03 44656 VALVE CABLE VARIABLE RATE ...
Страница 33: ...31 5 5 ITEM C04 44651 VALVE EXTENSION CABLE ...
Страница 34: ...32 5 6 ITEM C10 44650 11 POWER CABLE GREGSON MAVERICK ...