Unpacking the delivery
DN991456
© Nokia Corporation
21 (72)
Issue 3 en
Nokia Proprietary and Confidential
Remove the mounting rack
1.
Make sure that you have removed the BTS cover and prepared a clean
surface for working on the BTS.
2.
Turn the BTS over and lay it flat on its front.
3.
The mounting rack is attached to the back of the BTS for transportation. It
must be removed before continuing with installation. The mounting rack
can be seen in detail in Figure 7. Loosen the offset screws on the bottom
and the top of the mounting rack: on the L-beam and screws B1 and B2. Do
not remove the screws completely.
4.
Remove the wooden spacer blocks and the mounting rack.
4.2
Contents of the BTS transportation package
Refer to Table 4 and Figure 1 for the contents of the transportation package for
the Nokia MetroSite EDGE Base Station.
Table 4.
Checklist for contents of the transportation package for the Nokia
MetroSite EDGE Base Station
Part
Notes
BTS chassis with the ordered units pre-
installed.
Shield units are installed in the slots that
are not populated with functional units
BTS cover
T-shaped mounting rack
Provides the fixing base for the BTS
Two Allen screws, M6 x 20
For fixing the BTS to the mounting rack
Cable cover
For cables routed out of the BTS
Cable cover support
Mounting for the cable cover
Diversity cables
Safety strap
For securing the cover to the chassis
Four unit retaining screws
Spare parts
Spare counterparts for the unit retaining
screws
Attached to the uppermost TRX guide
beam on the top of the BTS
Key for BTS lock