Preparations for installation
DN991456
© Nokia Corporation
15 (72)
Issue 3 en
Nokia Proprietary and Confidential
Note
Caution
3
Preparations for installation
Before beginning installation, check the delivery, the site, and the required tools
and extra parts against the relevant checklists.
The installation of the Nokia MetroSite EDGE Base Station can be carried out by
one person if units are removed before mounting the cabinet. However, it requires
at least two people to lift a BTS with its units installed.
Use only trained and authorised personnel for installing and commissioning the
Nokia MetroSite EDGE Base Station.
3.1
Checking the delivery
Before unpacking any of the packages, check that the delivery is correct. Confirm
that the delivery notes on each package agree with the order note.
3.2
Checking the site
The BTS site has been planned and prepared according to the specifications given
in
Nokia MetroSite EDGE Base Station: Requirements for Installation and
Operation
. Before beginning installation, check the site against these
specifications using a site preparation checklist.
If the site conditions do not conform to the checklist, stop the installation at this
stage and return to the site preparation procedures.
All manuals and user guides at all-guides.com