List of Figures
Flexi Zone Micro BTS (FWHR) interface panel.................................... 9
Flexi Zone Micro BTS clearances....................................................... 11
Disassembling the mounting bracket..................................................12
Fixing the interface bracket................................................................ 12
Static mounting bracket keyholes.......................................................13
Installing the static mounting bracket on the wall............................... 14
Rubber plug location...........................................................................15
Correct bracket alignment.................................................................. 16
Installing the BTS on a wall................................................................ 16
Flexi Zone Micro BTS (FWHR) interface panel.................................. 17
Flexi Zone Micro BTS clearances.......................................................19
Disassembling the mounting bracket..................................................20
Fixing the interface bracket................................................................ 20
Threading the straining straps............................................................ 21
Installing the installation plate to the pole...........................................21
Rubber plug location...........................................................................22
Correct bracket alignment.................................................................. 23
Installing the BTS on a vertical pole................................................... 23
Flexi Zone Micro BTS (FWHR) interface panel.................................. 24
Flexi Zone Micro BTS clearances.......................................................26
Disassembling the mounting bracket..................................................27
Fixing the interface bracket................................................................ 28
Threading the straining straps............................................................ 28
Installing the static mounting bracket on the pole...............................29
Rubber plug location...........................................................................30
Correct bracket alignment.................................................................. 31
Installing the BTS on a horizontal pole............................................... 31
Power cable alignment....................................................................... 33
Complete cabling of the Flexi Zone Micro BTS.................................. 34
Removing the seal..............................................................................35
Preparing the copper cable................................................................ 35
Connecting the copper cable..............................................................36
Fastening the grommet to the BTS.....................................................36
Pushing the grommet into the grommet housing................................37
Fastening the nut to the grommet housing......................................... 37
Removing the seal..............................................................................38
Preparing the optical cable................................................................. 38
Installing and Cabling Flexi Zone Micro High Power 2x20 W BTS
Issue: 02
DN09229011
5