5
Tighten the bracket’s fastener according to the manufacturer’s instructions.
6
Install the BTS to the static mounting bracket.
w
NOTICE:
If you lift the unit with a rope, use an M6 size eyebolt with a M6 x 1.0 thread.
The eyebolt should be fixed to the top of the BTS, in place of the rubber plug. The
eyebolt should be removed and replaced with the rubber plug after installing the BTS.
The eyebolt is not part of the delivery and must be ordered separately.
Figure 8
Rubber plug location
Rubberplug
a) Position the BTS with the interface bracket aligned directly above the static
mounting bracket.
b) Slide down the BTS until it is fully located and seated onto the static bracket.
c) Hand start the thumb screws (M6) to secure BTS to static bracket.
d) Torque all M6 screws to 5.1 Nm (3.8 ft-lb).
Installing and Cabling Flexi Zone Micro High Power
2x20 W BTS
Installing Flexi Zone Micro BTS
Issue: 02
DN09229011
15