
EN
OPERATION
ASC- 15 / ASC- 57 (10- 11)
6
MACHINE COMPONENTS
3
4
13
11
7
5
1
2
10
12
6
8
9
15
14
16
17
18
19
22
24
28
21
20
23
27
25
26
1. Vacuum/Blower ON/OFF Switch
2. Pump ON/OFF Switch
3. Hour Meter
4. Blower Hose Connector
5. Power Cord equipped with
Ground Fault Circuit Interrupter Device (120V)
6. Accessory Tools/Cleaning Formula Compartment
7. Formula Injector Hose
8. Two Piece Double Bend Wand
9. Floor Brush
10. Recovery Tank
11. Recovery Tank Drain Hose
12. Solution Tank
13. 12 in / 305 mm Stair Climbing Wheels
14. Vacuum Hose Storage Hooks
15. Vacuum Hose Connector
16. Spray Gun Storage Hook
17. Solution Hose Coupler
18. Cleaning Formula ON/OFF Lever
19. Internal Component Access Latches
20. Solution Tank Fill Hose
21. 25 ft / 7.6 m Vacuum Hose (Black)
22. 6 ft / 1.8 m Expandable Blower Hose (Gray)
23. Blower Hose Nozzle
24. Spray Gun and Solution Hose
25. 14 in / 356 mm Squeegee Floor Tool Attachment
26. 12 in / 305 mm Glass Squeegee Hand Tool
27. Gulper Tool Vacuum Hose Attachment
28. Grease Gun for Pump