1.  Clean an area, where the tent should be placed. Mainly sharp objects and chemicals have to be removed. Use of protec

 on  

blanket is recommended.

2.  Remove tent from the bag, place it to its future posi

 on.      

3.  Check posi

 on and func

 on of all four valves. Due to an order of one way central in

 a

 on system, the 

black in

 a

 on valve 

must be installed on posi

 on signed with 

black arrow

. A base part of black valve must be properly 

 ghted (check a valve seal 

before use), small black cap must stay open. 

Red overpressure valves

 must be installed on other 3 posi

 ons, well 

 ghted to 

prevent air leak. In a case tent was not used for longer 

 me period, it is recommended to check func

 oning of all overpressure 

valves by pushing the spring with a 

 nger or blowing through the valve.Paralelly, seats of all valves shall be checked to avoid 

sand grains or dirt to block closing the valve.

    

red overpressure valves

   

black in

 a

 on valve

  

black arrow posi

 on

4.   Check correct placement of small roof over the central assembly

5.  Connect a hose of pump to the black valve and start in

 a

 on.

6.  By the gradual ac

 on of springs in central in

 a

 on system, legs of AXION tent are in

 ated gradually.The 

 rst in

 ated leg is 

one with installed black (in

 a

 on) valve.In the second phase le

đ

  and right leg are in

 ated.In the third phase a tranverse leg is 

in

 ated. In this step it is important to „help“ a leg to erect (see picture).

7. Con

 nue an in

 a

 on within whole structure gets rigid, ideally 

 ll the moment when one of overpressure valves would open 

automa

 cally. Overpressure valves are calibrated to the maximum allowable pressure, do not overpressure your tent more as 

necessary. Do not disable overpressure valves, it may cause a bladder rupture!

8. A

 er releasing an in

 a

 on hose, close and 

 ght the small black cap of in

 a

 on valve .

9.  Side walls and visors can be zipped on the tent all the 

 me, but we rather suggest to install it to already in

 ated tent. Each wall 

or visor 

 ts to each side of the tent. An artwork side of the wall may be faced to outside or inside of the tent. Check span of 

legs before zipping the wall on the roof. Span of legs bigger as width of side wall can cause damage of zipper during zipping on 

the wall. Try to minimaze a stress of zipper by fair handling. Secure end of zipper with velcro a

 er zipping on the side wall.

DEFLATION

1.  Zip o

  all side walls and visors, pack each separately.

2.  Open a valve on one leg, ideally on the leg which was last in

 ated (diagonally to the in

 a

 on leg).Once some air is released and 

internal pressure in the leg decrease, pull the leg to the transverse one. A

 er whole tent will lay down, open rest 3 valves.

3.  Once most of air is released, put legs to the paralell order, see picture below.

4,  Rolling the tent in a direc

 on from small roof towards to valves. In this way you will release the rest of air out of the structure.

Unroll it and roll again to get a compact package, 

 

  ng into the trolley bag. A last step before pu

  ng the package into the bag 

is to screw all valves back into their posi

 on.

 

5.  Steel spikes must be packed in an extra pouch, which is included in a delivery.Put a pouch into separate pocket in a trolley bag. 

Put spare parts and a repair kit into another separate pocket in a trolley bag. When all parts including side walls etc are in a trol-

ley bag, zip it on smoothly. If the volume is too big, use support tapes with trident buckles to bing the bag, decrease a volume 

and help the zipper to prevent its damage.

Содержание Pneu Zelte Lite

Страница 1: ...t WIR BLASEN AUF SIE FALLEN AUF www noproblaim at PNEU ZELT LITE SETUP MANUAL Pneu Werbemittel Pneu Zelte Pneu M bel MAX S ulen B gen Specials Zelte Info Bars Walker W nde W rfel Tower Sky Dancer Sky...

Страница 2: ...ghted to prevent air leak In a case tent was not used for longer me period it is recommended to check func oning of all overpressure valves by pushing the spring with a nger or blowing through the val...

Страница 3: ...ng an in a on hose close and ght the small black cap of in a on valve 9 Side walls and visors can be zipped on the tent all the me but we rather suggest to install it to already in ated tent Each wall...

Страница 4: ...g on the side wall DEFLATION 1 Zip o all side walls and visors pack each separately 2 Open a valve on one leg ideally on the leg which was last in ated diagonally to the in a on leg Once some air is r...

Страница 5: ...on zippers or weaved side walls In a case of strong wind it is recommended to anchor wall base with steel spikes through eyelets too 2 There are main ropes a ached to points A directly from the facto...

Страница 6: ...WIR BLASEN AUF SIE FALLEN AUF www noproblaim at PROPERLY ANCHORED TEN BASIC 3 Push triangular plas c cleats towards to the roof to ghten all ropes PROPERLY ANCHORED TENT BASIC...

Страница 7: ...the spike of point D As the rope is shorter it is well tensioned to help a tent to resist a strong wind PROPERLY ANCHOED TENT TO THE STRONG WIND ANCHORING TO THE STRONG WIND to the ground 4 Repeat a...

Страница 8: ...deal posi ons of legs Side to lay down is a side with hooks A valve is place on a top side Hooks must be directed diagonally to the tent facing to aluminium buckles of tent TOP VIEW BOTTOM VIEW YOU MA...

Страница 9: ...Angaben ohne Gew hr nderungen und Druckfehler vorbehalten Bezeichnungen Produkte Fotos Skizzen und Texte sind geistiges Eigentum der no problaim Werbetr ger GmbH Sie d rfen ohne ihr Einverst ndnis we...

Отзывы: