Total Station DTM-322 Instruction Manual
65
Applications
4
DivLine S-O
This function divides the line between the instrument and the first target by an input
span number. It then guides you to stake out the points, one by one.
1.
Press
[3]
or select
DivLine S-O
in the Stakeout
menu.
2.
Set up the baseline. To do this, sight the target on
the line (the end point) and press
[MSR1]
or
[MSR2]
.
3.
Enter the total stake number in the Span total
field.
The observation screen for the first stake (from
the instrument) appears.
4.
Sight the prism and press
[MSR1]
or
[MSR2]
.
5.
Use
[^]
or
[v]
to change the guide point. You can
calculate and guide up to double the number of
the stakes.
6.
To record the point as an SO record, press
[ENT]
.
For example, if you measure to the end point at 100 m from the instrument and set the span total to 2, the
following four points are calculated and can be staked:
<1/2>
HD
<2/2>
<3/2>
<4/2>
50 m
100 m
150 m
200 m
Содержание Total Station DTM-322
Страница 1: ...www trimble com Total Station DTM 322 Instruction Manual Version A 1 0 0 Part Number C232E April 2009 ...
Страница 8: ...viii Total Station DTM 322 Instruction Manual ...
Страница 14: ...Contents xiv Total Station DTM 322 Instruction Manual ...
Страница 60: ...3 Getting Started 46 Total Station DTM 322 Instruction Manual ...
Страница 157: ...C H A P T E R 8 Total Station DTM 322 Instruction Manual 143 System Diagrams 8 In this chapter System Components ...
Страница 160: ...8 System Diagrams 146 Total Station DTM 322 Instruction Manual ...
Страница 176: ...9 Communications 162 Total Station DTM 322 Instruction Manual ...