Nice Road200 Скачать руководство пользователя страница 5

5

GB

3

3.1) Preliminary checks

Before proceeding with the installation of ROAD200 you must:
• Check that all the materials are in excellent condition, suitable for

use and that they conform to the standards currently in force.  

• Make sure that the structure of the gate is suitable for automation.
• Make sure that the weight and dimensions of the leaf fall within the

specified operating limits provided in chapter “2.1 Operating lim-
its”.•

Check that the static friction (that is, the force required to start the

movement of the leaf) is less than half the “maximum torque”, and
that the dynamic friction (that is, the force required to keep the leaf
in movement) is less than half the “nominal torque”. Compare the
resulting values with those specified in Chapter “8 Technical Char-
acteristics”. The manufacturers recommend a 50% margin on the
force, as unfavourable climatic conditions may cause an increase
in the friction. 

• Make sure that there are no points of greater friction in the open-

ing or closing travel of the gate leaves.

• Make sure there is no danger of the gate derailing and risk of it exit-

ing the guide. 

• Make sure that the mechanical stops are sturdy enough and that

there is no risk of the deformation even when the leaf hits the
mechanical stop violently.

• Make sure that the gate is well balanced: it must not move by itself

when it is placed in any position.

• Make sure that the area where the gearmotor is fixed is not sub-

ject to flooding. If necessary, mount the gearmotor raised from the
ground.

• Make sure that the area in which the gearmotor is mounted allows

it to be easily released and that the manual manoeuvre is easy and
safe. 

• Make sure that the mounting positions of the various devices are

protected from impacts and that the mounting surfaces are suffi-
ciently sturdy.

• Components must never be immersed in water or other liquids.
• Keep ROAD200 away from heat sources and naked flames; in

acid, saline or potentially explosive atmosphere; this could damage
ROAD200 and cause malfunctions or dangerous situations.

• If there is an access door in the leaf, or within the range of the gate

movement, make sure that it does not obstruct normal travel.
Mount a suitable interblock system if necessary. 

• The control unit must be connected to a power supply line

equipped with a safety grounding system.

• The power supply line must be protected by suitable magneto-

thermal and differential switches. 

• A disconnection device must be inserted in the power supply line

from the electrical mains (the distance between the contacts must
be at least 3.5 mm with an overvoltage category of III) or equiva-
lent system, for example an outlet and relative plug. If the discon-
nection device for the power supply is not mounted near the
automation, it must have a locking system to prevent unintention-
al, unauthorised connection.  

The installation of ROAD200 must be carried out by qualified personnel in compliance with current legislation, standards

and regulations, and the directions provided in this manual.

!

3) Installation 

3.2) Installation of the gearmotor

The gearmotor must be fastened directly to an already existing mounting surface using suitable means, for example expansion screw
anchors. Otherwise, in order to fasten the gearmotor the installer must: 
1. Dig a foundation hole with suitable dimensions referring to Figure 3.
2. Prepare one or more conduits for the electrical cables as shown in figure 4
3. Assemble the two clamps on the foundation plate setting one nut underneath and one on top of the plate.

The nut underneath the plate must be as shown in Figure 5 screwed so that the threaded part protrudes above the plate by approximately
25÷35 mm.

4. Pour the concrete and position the foundation plate at the distances shown in fig. 3, making sure it is level and in line with the leaf before

the concrete sets. Wait for the concrete to harden completely.

5. Remove the 2 upper nuts of the plate and then place the gearmotor onto them.

Check that it is perfectly parallel to the leaf, then screw the two nuts and washers supplied, as shown in Figure 7.

6

4

5

7

330

192

25÷35

192

330

0÷50

0÷50

0÷10

0÷10

Содержание Road200

Страница 1: ...installatore Instructions et recommandations pour l installateur Anweisungen und Hinweise f r den Installateur Instrucciones y advertencias para el instalador Instrukcje i uwagi dla instalatora Aanwi...

Страница 2: ...ommissioning 11 5 1 Testing 11 5 2 Commissioning 12 6 Maintenance and Disposal 12 6 1 Maintenance 12 6 2 Disposal 12 7 Additional information 12 7 1 Programming buttons 12 7 2 Programming 13 7 2 1 Lev...

Страница 3: ...plicitly provided for in these instructions is not permitted Improper use may cause damage and personal injury Risk analysis must be carried out before starting installation to include the list of ess...

Страница 4: ...3 Photocells 4 Main movable edge 5 Open stop bracket 6 Rack 7 Secondary fixed edge optional 8 Flashing light with incorporated aerial 9 ROAD200 10 Closed stop bracket 11 Radio transmitter 3 9 2 3 List...

Страница 5: ...this could damage ROAD200 and cause malfunctions or dangerous situations If there is an access door in the leaf or within the range of the gate movement make sure that it does not obstruct normal trav...

Страница 6: ...art of the rack 10 Open and close the gate several times by hand and make sure that the rack is aligned with the pinion with a maximum tolerance of 5mm Moreover check that the play of 1 2mm has been r...

Страница 7: ...neath the hole the cables enter through Make a hole in the rubber membrane which is slightly smaller than the diameter of the cables which have been collected together and insert the membrane along th...

Страница 8: ...special procedures on the input For more useful information about STOP see also Paragraph 7 3 1 STOP Input 1 5 Photocell input for safety devices such as photocells Cut in during closure inverting the...

Страница 9: ...ly 1 Press the PP button to open the gate Check that gate open ing occurs regularly without any variations in speed The leaf must only slowdown and stop when it is between 50 and 30 cm from the openin...

Страница 10: ...mand T2 button Pedestrian gate command T3 button Open command T4 button Close command Table 5 Memorization Mode I T1 button Open command Automation A T2 button Close command Automation A T3 button Ped...

Страница 11: ...r to ensure the maximum safety levels Testing can also be adopted as a method of periodically checking that all the various devices in the system are functioning correctly Testing of the entire system...

Страница 12: ...n the corresponding maintenance schedule 1 ROAD200 requires scheduled maintenance work every 6 months or 10 000 manoeuvres max after previous maintenance 2 Disconnect the power supply and buffer batte...

Страница 13: ...e lapses the procedure will finish automatically and memorize the modifications made up to that stage 1 Press the button Set and hold it down approx 3 s 3s 2 Release the Set button when L1 LED starts...

Страница 14: ...te Points 3 to 7 can be repeated during the same programming phase in order to set other parameters Table 16 changing the adjustable parameters Example SET SET SET SET SET 7 2 5 Level one programming...

Страница 15: ...utoma tion system at any time In particular various devices types can be connected to STOP input as explained in paragraphs 7 3 1 STOP Input 7 3 1 STOP input STOP is the input that causes the immediat...

Страница 16: ...tructions if 2 pairs of photocells are used that could interfere with one another 7 4 1 Always open Function The Always open function is a control unit feature which enables the user to control an ope...

Страница 17: ...w for this type of door Check to see whether there are any obstacles if necessary increase the force 7 7 Diagnostics and signals A few devices issue special signals that allow you to recognize the ope...

Страница 18: ...ee Table 20 Off Activation of the STOP input Check the devices connected to the STOP input On Everything OK STOP Input active 27 L1 LED Description Function programming in progress If it flashes toget...

Страница 19: ...table for the automation of gates featuring leaves up to 5 m wide and weighing up to 200 kg as shown in Tables 1 and 2 Max absorbed power 150W 0 9A Insulation class 1 a safety grounding system is requ...

Страница 20: ...ery Absorption 25mA Battery life 1 year estimated on the basis of 20 commands day each lasting 1s at 20 C at low temperatures the efficiency of the batteries decreases Irradiated power 100 W Dimension...

Страница 21: ...and reliable activation However chil dren should not be allowed to play in the vicinity of automated systems to prevent any accidental acti vations keep all remote controls away from chil dren they ar...

Страница 22: ...must be repaired as soon as possible Replace the Remote Control Battery if your radio control after a period of time seems not to work as well or not to work at all it may simply be that the battery i...

Страница 23: ...ltre il prodotto risulta conforme a quanto previsto dalle seguenti direttive comunitarie cos come modificate dalla Direttiva 93 68 CEE del consiglio del 22 Luglio 1993 Furthermore the product complies...

Страница 24: ...e Sud Aubagne France Tel 33 0 4 42 62 42 52 Fax 33 0 4 42 62 42 50 infomarseille fr niceforyou com Nice Belgium Leuven Heverlee Tel 32 0 16 38 69 00 Fax 32 0 16 38 69 01 info be niceforyou com Nice Es...

Отзывы: