background image

21

21

APOLLO

Gate Operators, Inc.

911 Siren

Mount siren in an area that will produce maximum performance (additional wire may be required).

Connect the red wire to the SIREN connector on the Remote Monitor Output Connector block.

Connect the black wire to the GND connector on the Remote Monitor Output Connector block.

Red

Black

Set Program Switch # 4 as preferred:

ON

- Upon activation, Siren will start for 5 seconds before gate(s) begin moving.

OFF

- Siren and gate(s) start immediately upon activation.

The 911 Siren is included with all Apollo ETL Gate Operators.

Содержание HYPPO DUALETL

Страница 1: ...INSTALLATION MANUAL 08 10 HYPPOETL HYPPO DUALETL 12 VOLT DC Swing Gate Operator Manufactured by NICE SpA...

Страница 2: ...perator Components 6 Operator Dimension 7 Operator Installation 8 Electrical Connections 11 Encoder Board Connections 12 Limit Adjustments 13 Battery Connections 14 Programming Current Sensing 15 Cont...

Страница 3: ...with operator controls Keep the remote con trol away from children Always keep people and objects away from the gate NO ONE SHOULD CROSS THE PATH OF THE MOVING GATE ARM Test the operator monthly see...

Страница 4: ...outages The battery may be recharged with a trickle charger or by solar energy eliminating the need for costly trenching to remote entrances If a trickle charger is used and a standard electrical out...

Страница 5: ...d If additional cable is required do not cut out the blocking diode when adding the cable 4 Is electricity available if required Consider safety and access options Recommend if needed 1 Will there be...

Страница 6: ...Assembly b Arms two pieces c Attach Bracket d Mounting Hardware e Manual Release Handel and Lock Keys f Control Box g Cable 8 FT OR 38 FT Single or Dual h Caution signs 2 I Battery Charger optional J...

Страница 7: ...Operator Dimensions and Arm Lengths Standard Arms Extended Arms PART NH HYA12 Amax 5 7 8 15 3 4 Bmax 13 3 4 17 3 4 Cmax 17 3 4 31 1 2 13 3 4 6 1 2 9 1 2 6 3 1 2 Note Extended arms are ordered separat...

Страница 8: ...8 Step 1 Disengage Motor using manual release and remove cover Operator Installation...

Страница 9: ...the gate where the operator will attach B Install mounting bracket using cart below Note Mounting bracket may be either welded or bolted 17 3 4 B 3 1 2 4 3 8 5 7 8 7 7 8 9 7 8 11 13 16 13 3 4 A 4 3 8...

Страница 10: ...install motor on bracket and install and arm assembly Push the arms assembly up against the gate in the closed position Tack weld or c clamp the gate bracket to the gate Per manent welds or bolt at ta...

Страница 11: ...box with terminals toward the front Do not use any battery with side terminals Step 8 Connect harness to motor Route the cable from the control box to the operator Connect the cable to the side of the...

Страница 12: ...12 SIREN GND Harness BLUE YELLOW YELLOW RED BLACK Step 9 Connecting the Motors to the Board Harness is factory wired in the control box as shown on this page...

Страница 13: ...ar until the open limit LED illuminates Step 11 Re install Cover and re engage manual release Hint To test wiring of motor do the following 1 Put gate 1 2 way closed and plug main harness into emergen...

Страница 14: ...mpere hour battery is recommended with solar charging BAT12V33 12 Volt 33 to 34aH Sealed Battery Connect the two ring terminals on the connec tor end of the cable to the battery The battery charger or...

Страница 15: ...cedure 1 Press and hold the LED ENABLE see page 13 button for five seconds and release The STOP LED will blink indicating that the board is in learn mode 3 Cycle gate arm for 3 4 full cycles The STOP...

Страница 16: ...Battery Polarity Indicators Optional Device Input Remote Monitor Outputs Microprocessor Timer To Close Dual Gate Delay Current Sensitivity Adjustments Program Switches 835 836 Control Board Parts Iden...

Страница 17: ...ximum travel or the 15 amp fuse will open Fuse should be checked before returning gate to service EMERGENCY BYPASS 12V Supplied battery voltage SLV Slave Operator Indicator indicates slave side of gat...

Страница 18: ...to assist in installation and troubleshooting Hold the push button down for five seconds to put the board in program mode RESET Resets the microprocessor Returns processor to last known state Jumpers...

Страница 19: ...eased 6 LOCK TYPE For 12V mechanical solenoid locks For 12V magnetic locks 12V for 4 seconds on open cycle 12V when on close limit 7 COAST ENABLE Gate will stop immediately when at Gate will coast min...

Страница 20: ...ion see program switch 5 for options OPEN Open input from a 3 button station see program switch 5 for options GND Supplied Battery Ground GND Supplied Battery Ground FREE EXIT Opens gate if closed sto...

Страница 21: ...or on the Remote Monitor Output Connector block Connect the black wire to the GND connector on the Remote Monitor Output Connector block Red Black Set Program Switch 4 as preferred ON Upon activation...

Страница 22: ...itches to the same position Transmitters must match code switches for proper operation If power is taken directly from battery or connected as shown below receiver should be configured for 12VDC Multi...

Страница 23: ...Lead Acid Recommended Battery solar charged 12 V 105 aH Battery Charger 1 5 or 6 amp Automatic Recommended Solar Panel 5 watt minimum Duty Cycle 40 with proper charging Operating Temperature 400 F 15...

Страница 24: ...lightning The manufacturer will not be responsible for any labor charges incurred in the removal or replacement of defective parts In case of failure due to defective material or workmanship during t...

Отзывы: