9
7 - POST INSTALLATION
Install two 3” diameter posts parrallel to the
gate as shown. Posts must be secured into
ground as necessary for your type of soil
conditions and building codes. Post height
must be a minimum of 24” out of the ground.
DRIVEWAY
Direction of opening
Centerline of gate
6”
24”
Inside posts
5”
Mount operator to posts at desired height using the four
supplied 3” U-Bolts and tighten into place making sure
operator is level.
8 - CHASSIS MOUNTING
9 - CHAIN BRACKET MOUNTING
Mount chain brackets to gate frame either by using the four
supplied 2” U-Bolts or by tack welding in place.
Put the gate in the center of travel of the opening.
The gate should remain in this position while the
chain is attached to the operator.
Содержание 72001K
Страница 1: ...Nice Apollo Slide Gate Opener Vehicular Slide Gate Operator Revision 1 0 0 0_2 2014 Model 72001K...
Страница 2: ......
Страница 30: ...30...