all
mon
tues
wed
thur
fri
sat
sun
activated
schedule 2
schedule 1
SCHEDULING VENTILATION
1.3.3
21:30 - 06:00
speed 3
Activated
Schedule
Time period
Adjusting
Day
Conflict
Schedule:
The schedule to be changed is selected here.
Activated:
Scheduling for the selected period is activated here. Set times are
not affected at deactivation.
Day:
Select which day or days of the week the scheduling is to apply to here.
To remove the scheduling for a particular day, the time for that day must be reset
by setting the start time to the same as the stop time. If the row "all" is used, all
days in the period are set according to that row.
Time period:
The start and stop time for the selected day for scheduling are se-
lected here.
Adjustment:
The desired fan speed is set here.
Conflict:
If two settings conflict with each other, a red exclamation mark is dis-
played.
TIP
If you wish to set similar scheduling for every day of the week start
by filling in “all” and then changing the desired days.
33
Chapter 3 | VVM 225 – at your service
NIBE VVM 225
Содержание VVM 225
Страница 1: ...UHB EN 2028 3 431489 USER MANUAL Electric boiler indoor module NIBE VVM 225...
Страница 4: ...91 Contact information NIBE VVM 225 Table of Contents 4...
Страница 90: ......