(e) Mounting rails on coach bolts (universal plus slate
roofs)
Correct conditions are required for this variant.
The mounting rails are secured on coach bolts that are fixed
with the upper and lower nuts. The arrow indicates where the
mounting rail should go in.
Caution
The coach bolt should only be used if the base it is
to be screwed into is substantial and strong. This
must be established by the installation company.
The installer must evaluate if the moisture protection is suffi-
ciently secure, this is based on factors such as roof pitch in
relation to the rubber seal’s position against the roof base,
the smoothness of the roof base also has an impact.
$
%
&
4. Install the stop lug
The stop lug must be installed in the end of lower rails so that
the lower fixing wedges are secured.
Secure the fixing wedge (A) loosely in the rail using screw
M10 x 25, wing nut (B) and washer.
Then secure the stop lug (C) on the underside of the rail with
screws M10 x 25, washers and nut.
5. Align the first solar panel
NOTE
Before the first solar panel is aligned, check that all
the mounting components are tightened and that
the roof is sealed.
The solar panel must always be located with the temperature
sensor pointed upwards. Check that the solar panel is posi-
tioned under both fixing wedges. Then remove the corner
protection.
31
Chapter 4 |
Mounting
SOLAR FP215 P/PL
Содержание SOLAR FP215 P
Страница 1: ...Installer manual SOLAR FP215 P PL IHB GB 1124 1 031968 ...
Страница 2: ......
Страница 39: ...α β δ a 37 Chapter 4 Mounting SOLAR FP215 P PL ...
Страница 75: ......
Страница 76: ...NIBE AB Sweden Hannabadsvägen 5 Box 14 SE 285 21 Markaryd info nibe se www nibe eu 031968 ...