
Docking
SMO 10
22
FIGHTER 2010 / 2005 is docked to the immersion heater after the shuttle
valve together with SMO 10 and water heater (floating condensing)
AV
Shut-off valve
BV Non-return
valve
EXP
Expansion tank with requisite
safety equipment
FG1
Flow sensor 1
FG2
Flow sensor 2
HR
Auxiliary relay
LP1
Charge pump 1
LP2
Charge pump 2
PG
Boiler sensor
RG1
Return sensor 1
RG2
Return sensor 2
FIGHTER 2010
HR
VVC
LP1
UG
VVG
VXV1
VVC
RG1
CP1
FG1
ELK
EXP
SMO 10
AV
SÄV
AV
AV
BV
SMO 10 controls FIGHTER 2010 / 2005, immersion heater,
circulation pump, shunt, etc. FIGHTER 2010 / 2005 works
with floating condensing against the heating system and pri-
oritizes hot water charging via the shuttle valve (VXV1).
FIGHTER 2010 /2005 works in stage 1 or stage 2 depending
on the outdoor air temperature and the heating requirement.
If FIGHTER 2010 / 2005 cannot meet the heating require-
ment, additional heated is connected from the immersion
heater.
When additional heat is engaged, hot water is heated using
the immersion heater in the hot water heater.
The outline diagram is equipped with accessories.
RV
Control valve
SF
Particle filter
Included in
FIGHTER 2010/2005
SV1
Shunt valve 1
SÄV
Safety valve
TV
Drain valve
UG
Outside sensor
VVC
Hot water circulation
VVG
Hot water sensor
VXV1
Shuttle valve 1
VXV2
Shuttle valve 2
PoolG Pool sensor
Abbreviations
FIGHTER 2010/2005
Содержание SMO 10
Страница 1: ...R MOS GB 0521 1 511262 SMO 10 INSTALLATION AND MAINTENANCE INSTRUCTION SMO 10...
Страница 2: ......
Страница 50: ...Electrical circuit diagram 48 SMO 10 Sheet 1 4...
Страница 54: ...Dimensions 52 SMO 10 405 406 151 5 328 276 Dimensions and setting out coordinates...
Страница 58: ...SMO 10 56...
Страница 59: ......