General information for the installer
SMO 10
12
Current regulations require the heating installation to
be inspected before it is commissioned. The inspec-
tion must be carried out by a suitably qualified person
and should be documented. The above applies to
installations with a closed expansion vessel. If the
electric boiler or the expansion vessel is replaced, the
installation must be inspected again.
Inspection of the installation
SMO 10 is installed by mounting it on a wall using four
screws. There are two holes at the rear for mounting
and two straight-through holes in the electrical con-
nection area.
Mounting
405