Transport and storage
ERS 10 should be transported and stored in the dry.
Assembly
ERS 10 is installed using the enclosed rail on a solid
wall. Noise from the fans can be transferred to the rail.
• Install with its back to an outside wall, ideally in a room
where noise does not matter, in order to eliminate
noise problems. If this is not possible, avoid placing
it against a wall behind a bedroom or other room
where noise may be a problem.
• Wherever the unit is located, walls to sound sensitive
rooms should be fitted with sound insulation.
• Condensation comes from the underside of the vent-
ilation heat exchanger. Condensation outlet with water
seal must be installed and routed to an internal drain.
• The ventilation heat exchanger’s installation area
should always have a temperature of at least 10 °C
and max. 35 °C.
INSTALLATION AREA
Leave a free space of 800 mm in front of the product.
800
NOTE
Ensure that there is necessary space (300 mm)
above the exhaust ventilation heat exchanger
for installing ventilation hoses.
NIBE ERS 10-400
Chapter 2 | Delivery and handling
6
2 Delivery and handling