Preparations
• Check the miniature circuit-breaker (FA1) in the main
product. It may have tripped during transportation.
• Check that the air filters are clean, they can become
dirty after installation.
Filling and venting
• Check that there is water in the water seal, fill if ne-
cessary.
Start-up and
inspection
SETTING THE VENTILATION
Ventilation must be set according to applicable stand-
ards. The supply air flow is adjusted to ensure a negative
pressure. The settings are made in menus 5.1.5 and
5.1.6.
Even if ventilation is roughly set at installation it is im-
portant that a ventilation adjustment is ordered and
permitted.
Caution
An incorrectly set ventilation flow can damage
the house and may also increase energy con-
sumption.
NOTE
Order a ventilation adjustment to complete the
setting.
Ventilation capacity
0
0
10
20
30
40
50
60
70
80
90 100 110 120
100
200
300
400
500
600
Tillgängligt tryck
(Pa)
Flöde
(l/s)
30%
100%
80%
60%
40%
50%
70%
90%
Available pressure
Airflow
Fan rating
1
0
10
0
20
30
40
50
60
70
80
90 100 110 120 130
10
20
30
40
50
60
70
80
90
Effekt
(W)
Flöde
(l/s)
30%
100%
80%
60%
50%
90%
70%
40%
Output
Airflow
Dry temperature efficiency
according to EN 308
78
0
25
50
75
100
125
150
(l/s)
0
100 150
50
200
300
250
350 400
500
450
550
(m
3
/h)
80
82
84
86
88
90
92
94
Temperatur
(°C)
Luftflöde
Temperature efficiency
Airflow
(m³/h)
NIBE ERS 10-400
Chapter 6 | Commissioning and adjusting
16
6 Commissioning and adjusting
Содержание ERS 10-400
Страница 1: ...IHB EN 1948 1 531749 INSTALLER MANUAL Ventilation heat exchanger NIBE ERS 10 400 LEK...
Страница 2: ......
Страница 25: ......
Страница 26: ......