![Nibe CLIMATEMASTER Tranquility TFC 036 Скачать руководство пользователя страница 15](http://html1.mh-extra.com/html/nibe/climatemaster-tranquility-tfc-036/climatemaster-tranquility-tfc-036_installation-operation-and-maintenance-instructions-manual_1685810015.webp)
Tranquility
®
Fluid Cooler – 60 Hz
R e v. : F e b r u a r y 2 2 , 2 0 2 2
c l i m a t e m a s t e r.c o m
15
Flushing the Loop, Cont’d.
Figure 9c: Valve Position C - Full Flush
From Loop
To
Loop
Out
In
Valve Position
Add Antifreeze
Now if Needed
Dead Head
Pump Test
for Air
Flush Port
Front of Unit
Valve Position
Pressurize and Operate
As shown in Figure 9d, close the flush cart return valve
to pressurize the loop to at least 50 psi [517 kPA]. After
pressurizing, close the flush cart supply valve to isolate
the flush cart. Move the Fluid cooler water in and water
out valves to position D.
If the loop pressure is between 50 and 75psi [345 to
517 kPa] upon completion of flushing, pressure should
be sufficient for all seasons.
Unhook the flush cart from the fluid cooler. Install caps
on the fluid cooler water inlet and outlet to prevent and
leaks.
Figure 9d: Valve Position D - Pressurize and Operation
Out
In
Valve Position
2
Close to isolate
Internal Flow Controller
3
Close Internal Flow Controller
Valves for Operation Mode
From Loop
To
Loop
1
Dead Head
Pump to
Pressurize
to 50 PSI
Flush Port
Front of Unit
Valve Position
NOTICE:
It is recommended to run the unit for 15-20
minutes to ‘temper’ the fluid temperature and prepare
it for pressurization. This procedure helps prevent the
periodic “flat” loop condition of no pressure.
Figure 10: Air Bleed Vents
“Air Vents”
Note: Third “Air Vent”
located on back of unit.
“Water Drain”