![NIBE-BIAWAR HK 200M Скачать руководство пользователя страница 14](http://html.mh-extra.com/html/nibe-biawar/hk-200m/hk-200m_installation-manual_1686585014.webp)
14
HK 200M
•
The outdoor unit can be connected to the indoor
unit according to one of the system solutions to
be downloaded from website www.nibe.eu.
•
The part of the outdoor unit with the indoor unit
that remains outdoors must be made using flexi
-
ble hoses supplied with the outdoor unit.
•
We should install other elements supplied with
the outdoor unit.
•
All outdoor pipes must be thermally insulated with
a pipe lining with at least 20mm thickness.
•
Install cut-off and drain valves to allow for emp-
tying the outdoor unit in case of long power out-
ages.
•
The supplied flexible hoses act as vibration ab
-
sorbers. Flexible hoses must be installed to form
elbows that would attenuate vibrations.
Connection between the outdoor and in-
door unit
Chapter 4 |
Pipe connections
IMPORTANT
If the supply pump is controlled from the outside, it
must work even if the outdoor unit does not operate, to
prevent damage as a result of freezing.
Содержание HK 200M
Страница 1: ...15 02 2017 25957 HK 200M Installation manual Indoor unit cooperating with air heat pumps HK 200M ...
Страница 34: ...34 HK 200M Notes ...
Страница 35: ......