GEO
S12
EN54
HARDWARE
SETUP
PROCEDURE
System Manual GEOS12 EN54
Page
27
/
53
7.3.5
GEO S12 EN54 vertical array cable mounted on a ceiling
Required items
-
As
in 2 sections above, plus
-
2 x VNI-LBRK (allows cable suspension for bumper, holes for cable suspension are 10mm diameter)
-
4 x slings and shackles (
not provided
)
IMPORTANT
Ensure that the ceiling is strong enough to hold 4 times GEO S12 EN54 cluster weight and that the cables
suspension system required to fix the bumper under the ceiling is properly dimensioned.
Procedure
-
Connect
the bumper and the two “L” brackets using the screws, washers and bolts provided in the VNI-LBRK kit
-
Proceed
as in preceding sections
-
4 slings and 4 shackles (not provided) are required to secure the cluster under the ceiling
Содержание GEO S12 EN54 Series
Страница 34: ...TECHNICAL SPECIFICATIONS Page 34 53 System Manual GEOS12 EN54 9 1 2 Dimensions mm inches ...
Страница 36: ...TECHNICAL SPECIFICATIONS Page 36 53 System Manual GEOS12 EN54 9 2 2 Dimensions mm inches ...
Страница 38: ...TECHNICAL SPECIFICATIONS Page 38 53 System Manual GEOS12 EN54 9 3 2 Dimensions mm inches ...
Страница 40: ...TECHNICAL SPECIFICATIONS Page 40 53 System Manual GEOS12 EN54 9 4 2 Dimensions mm inches ...
Страница 52: ...USER NOTES System Manual GEOS12 EN54 Page 52 53 11 USER NOTES ...