GEO
S12
EN54
HARDWARE
SETUP
PROCEDURE
Page
28
/
53
System Manual GEOS12 EN54
7.3.6
GEO S12 EN54 horizontal array rigidly mounted on a ceiling
Required items
-
2 x VNI-ABRK (allows rigid ceiling suspension for horizontal arrays)
-
(N-1) x GPI-ANPL for a N x GEO S12 EN54 array (ANPL1 ranges from 0.2° to 3.15°, ANPL2 ranges from 5° to 10°, ANPL3
ranges from 16° to 30°)
-
4 x 12mm diameter screws (
not provided
)
IMPORTANT
Ensure that the ceiling is strong enough to hold 4 times GEO S12 EN54 cluster weight and that the four
screws 12mm diameter and corresponding plugs required to fix the
“L” brackets under the ceiling are
properly dimensioned.
Procedure
-
Set
all GEO S12 EN54 side by side
-
Remove the four TORX screws holding connector plates on
upper side of all GEO S12’s EN54
-
Remove
the connector plates from all Geo S12’s EN54
-
Position bottom external plates, angle plates and top external plate from GPI-ANPL kits to required inter-cabinet angle value
between cabinets upper sides
-
Use thread lock coated screws (if not apply Loctite 243 or equivalent to shoulder screws) from GPI-ANPL kits
-
Screw all shoulder screws so that all plates and cabinets are tightened together
-
Flip
the cluster upside down to access connector plates located on the down side
-
Repeat
all above steps
Содержание GEO S12 EN54 Series
Страница 34: ...TECHNICAL SPECIFICATIONS Page 34 53 System Manual GEOS12 EN54 9 1 2 Dimensions mm inches ...
Страница 36: ...TECHNICAL SPECIFICATIONS Page 36 53 System Manual GEOS12 EN54 9 2 2 Dimensions mm inches ...
Страница 38: ...TECHNICAL SPECIFICATIONS Page 38 53 System Manual GEOS12 EN54 9 3 2 Dimensions mm inches ...
Страница 40: ...TECHNICAL SPECIFICATIONS Page 40 53 System Manual GEOS12 EN54 9 4 2 Dimensions mm inches ...
Страница 52: ...USER NOTES System Manual GEOS12 EN54 Page 52 53 11 USER NOTES ...