3
3.
5.
7.
2.
6.
8.
1.
4.
Manual Splice
Splice
Splice
Splice location
(to be embeded into the floor)
Cold lead
Caution! Do not damage the product
Check cable integrity
Apply primer
Start near thermostat
NB! Remove foil before pouring
concrete
Check cable integrity before pouring concrete
Embed cables
Install tiles
Final integrity check
Содержание N-HEAT MILLIMAT
Страница 2: ...2 ...