* USE ONLY THE SILICONE LUBRICANT SUPPLIED

5

  Install the spring washer and M16 nut on to the threaded stud.

6

  Use torque wrench with a socket wrench 22 and tighten exerting 

50

 Nm (5 kgm or 36,9 foot-pounds) of torque.

 

In order to achieve the correct applied torque ensure that there is no lubricant on the threaded 

 

parts.

22mm

22mm

22 mm

socket

1/2" - 12,7 mm

torque wrench

L ≥ 90 mm

extension

50 Nm

30 Nm

1/2" - 12,7 mm

torque wrench

22 mm

socket

basic

insulating

plug

lubricate

1

  Clean and lubricate* the insulating plug for the opposite side of the connector.

2

  Insert the plug in the connector and tighten assembly : use torque wrench with socket of 22 and tighten exerting

 

30

 Nm (3 kgm or 22,1 foot-pounds) of torque.

 

In order to achieve the correct applied torque ensure that there is no lubricant on the threaded 

 

parts.

M16 nut

spring

washer

INSTALLATION OF THE BASIC INSULATING PLUG

IS91374-ENG - 489TB/G

-45/S - Revision 1

Page 8 of 9

!

FOR INFORM

ATION ONL

Please alw

ay

s use the instruc

tions supplied in the k

it

!

Содержание Euromold K489TB/G

Страница 1: ...y to be used on copper wire screened cable with extruded easy strip or bonded semi conductive screen and stranded circular conductors of copper or aluminium 3 x Cable reducer 911CA W Installation instructions Roll adhesive tape 3 x 489TB G tee connector Installation instructions for separable tee connector type C interface K M P 489TB G Up to 42 kV Water sealing mastic type MWS outdoor application...

Страница 2: ...nd proceed to step no 6 For outdoor applications Wrap one layer of water sealing mastic type MWS around the outer sheath flush with the end 25 mm minimum width Completely encircle the cable Bend the screen wires back over the mastic and along the outer sheath pressing them into the mastic IMPORTANT screen wires should not touch each other when pressed into the mastic to prevent water ingress 6 Usi...

Страница 3: ... semi conductive screen to a point 40 mm from the outer sheath Use an appropriate pencilling tool Make a smooth transition between core insulation and semi conductive screen 3 Remove any traces of conductive residue from the core insulation 325 40 core insulation outer sheath outer sheath For extruded easy strip semi conductive screen For bonded extruded semi conductive screen Page 3 of 9 IS91374 ...

Страница 4: ... tear off the excess mastic Using the coated side of the paper squeeze the mastic tightly in place on the step of the semi conductive screen 6 For outdoor applications Wrap another layer of water sealing mastic type NGAF Start taping 25 mm from the end of the outer sheath over the first mastic layer and the screen wires and continue up to a point 10 mm on the semi conductive screen Make a cone sha...

Страница 5: ...chart for crimp sequence 6 After crimping distance Z must be between 225 and 235 mm If necessary adjust the position of the cable reducer until distance Z is within the tolerance range Using adhesive tape secure the cable reducer 7 Remove any burrs left after crimping and wipe off excess inhibitor CRIMPING TIGHTENING OF THE CONTACT Compression type contacts Type TBC X A Z conductor contact deep in...

Страница 6: ... between 225 and 230 mm 5 Tighten the contact Please refer to the installation instruction included with the contact 6 After tightening distance Z must be between 225 and 235 mm If necessary adjust the position of the cable reducer until distance Z is within the tolerance range Using adhesive tape secure the cable reducer Mechanical type contacts Type TMBC X B cable reducer Before tightening After...

Страница 7: ...ently slide the housing on the cable Its final position is reached when the centre of the contact spade is along the axis of the interfaces of the connector The cable reducer must stay in place during installation USE ONLY THE SILICONE LUBRICANT SUPPLIED 3 Clean and lightly lubricate both connector and bushing interface 4 Push the connector on to the bushing equipment bushing 1 Install M16 threade...

Страница 8: ...1 2 12 7 mm torque wrench 22 mm socket basic insulating plug lubricate 1 Clean and lubricate the insulating plug for the opposite side of the connector 2 Insert the plug in the connector and tighten assembly use torque wrench with socket of 22 and tighten exerting 30 Nm 3 kgm or 22 1 foot pounds of torque In order to achieve the correct applied torque ensure that there is no lubricant on the threa...

Страница 9: ...elefax 32 0 53 83 10 13 sales euromold nexans com protective cap nylon vent rod Installation on insulating plug Clean the inside of the cap and the outside surface of the connector and insulating plug Place the nylon vent rod along the insulating plug see fig to exhaust the air during assembly of the cap Push the cap over the connector and on to the insulating plug Press the centre of the cap on t...

Отзывы: