1
Train the cable into the approximate finished
position next to the equipment bushing.
2
Mark the centre line
« M »
of the bushing.
3
Remove the outer cable sheath to a point
375
mm
from the centre line
« M »
of the bushing.
4
Sand the outer sheath over a distance of
50
mm.
5
Apply a tape marker around the outer sheath
55
mm from the edge. For indoor applications,
bend the screen wires back over the outer sheath
and proceed to step no. 6.
CONNECTOR INSTALLATION ON CABLE
CONNECTOR INSTALLATION ON BUSHING
cable reducer
connector
housing
equipment
bushing
clean thoroughly
lubricate
connector
housing
lubricate
1
Clean cable reducer, core insulation and contact.
2
Lubricate* the inside of the connector housing and outer surface of the cable reducer.
3
Check if the
longer interface of the tee connector is pointed towards the bushing.
Whilst preventing the
cable reducer from further movement down the cable, gently slide the housing on the cable. Its final position is
reached when the centre of the contact spade is along the axis of the interfaces of the connector.
The cable
reducer must stay in place during installation.
* USE ONLY THE SILICONE LUBRICANT SUPPLIED
3
Clean and lightly lubricate* both connector and
bushing interface.
4
Push the connector on to the bushing.
equipment
bushing
1
Install M16 threaded stud into the
bushing interface.
2
Using a 13 mm wrench or a hex key of
8 mm, tighten the stud exerting
30 Nm (3 kgm or 22,1 foot-pounds).
M16 stud
Page 7 of 9