
2
Contents
Pre-installation checks & general safety notes.
The Clean Air Act 1993 and Smoke Control Areas.
HETAS Ltd approval.
1.0 Technical and emission data.
2.0 Installation introduction
2.1
Unpacking the stove
2.2
Installing the stove
2.2.1
The tertiary air control
2.2.2
Assembling the baffle and removable internal stove parts
2.2.3
Stove data plate position
2.3
Stove placement / clearance requirements
2.4
The chimney
2.5
Stove pipe connection
2.6
Connecting to a masonry chimney
2.7
Connecting to a stainless-steel twin wall insulated flue system
2.8
Ventilation (Fresh air supply)
2.9
Chimney draft
2.92
Carbon monoxide alarm
2.95
Assembling the handle
2.96
Commissioning and handover
3.0 User Manual
3.1
Maximum fuel loads and choice of fuel
3.2
Use
3.2.1
Use with wood
3.2.2
Ash Removal
3.3
Maintenance
3.3.1
Replacing the glass panel to the stove door
3.3.2
Door seals
3.3.3
Cleaning and maintenance. (User)
3.3.4
Cleaning glass. (User)
3.3.5
Cleaning and checks inside the firebox. (User)
3.3.6
External surface cleaning. (User)
3.4
Operational problems – troubleshooting
3.5
Replacement parts
3.6
Product End-of Life / Recycling
3.7
Exploded view of stove parts and identification.
3.8
Declaration of Performance
3.9
Energy label
4.0
Product fiche
Содержание Rydal 5 SE
Страница 8: ...8 Figure 1 2 Top baffle positioning Figure 1 3 Left hand stove vermiculite fire cheek positioning...
Страница 10: ...10 Fig 1 6 Showing top steel baffle in position lower baffle positioning Fig 1 7 Stove main grate positioning...
Страница 49: ...49 3 7 Exploded view with part identification for Rydal 5 SE...
Страница 52: ...52 3 8 Declaration of Performance...
Страница 53: ...53 3 9 Energy Label...