41
INSTALLER INFORMATION
NAME:___________________________________COMPANY:________________________________
Call (____)__________________ for a service call or for additional information.
APPLIANCE INITIAL TEST AND SERVICE INFORMATION
MODEL:___________________________ INSTALLATION DATE:______________________________
DATE
1 FUEL INPUT (GPH)
2 FUEL PRESSURE (PSIG)
3 DRAFT @ BREECH
4 DRAFT @ OVERFIRE
5 NOZZLE ANGLE/PATTERN
6 CO2 PERCENT
7 BURNER MODEL
8 FLUE GAS TEMP 0F
9 ROOM TEMP 0F
10 SMOKE DENSITY NO.
11 FUEL GRADE NO.
12 STATIC PRESSURE IN WC (BONNET)
13 AIR TEMP. INLET 0F
14 AIR TEMP. OUTLET 0F
15 AIR TEMP RISE 0F
16 LIMIT CONTROLS FUNCTIONING PROPERLY
17
PRIMARY CONTROL SHUT OFF TIME (FLAME FAILURE)
SHUT OFF TIME (IGNITION FAILURE)
18 PULLEY TURNS OPEN
Содержание CL 115C
Страница 7: ...7 Figure 7 FLUE PIPE CONNECTION MINIMUM INSTALLATION CLEARANCES...
Страница 17: ...17 Figure 11 TYPICAL A C COIL INSTALLATION...
Страница 18: ...18 Figure 12 WIRING DIAGRAM WITH AIR CONDITIONING...
Страница 19: ...19 Figure 13 CL SERIES WIRING DIAGRAM...
Страница 23: ...23 Figure 17 1E AERO PGB 220 370 GAS BURNER EXPLODED ASSLY...
Страница 25: ...25 Figure 17 1G THERMO DISC MOUNTING ON BURNER PLATE...
Страница 26: ...26 Figure 17 2A AERO BURNER EXPLODED ASSEMBLY...
Страница 28: ...28 Figure 17 3A BECKETT BURNER EXPLODED ASSEMBLY...
Страница 56: ...Figure 17 3A ASSEMBLAGE EXPLOD DU BR LEUR BECKETT...
Страница 58: ...FIG 17 2A BR LEUR AERO ASSEMBLAGE CLAT...
Страница 59: ...FIG 17 1G LE DISQUE DE THERMO MONTE SUR LA PLAQUE DE BR LEUR...
Страница 64: ...FIG 13 C BLAGE DE LA S RIE CL...
Страница 74: ...FIG 7 RACCORDEMENT DU TUYAU DE FUM E ET ESPACE LIBRE MINIMAL FIG 8 EMPLACEMENTS DES COMMANDES...