background image

                                                                                   Part No. 803172 Issued 3-29-13 Rev 012015 

 
Installation 

1.  Carefully remove the dispenser from the 

shipping carton. 

2.  

Before attaching the waterline to the 
dispenser, flush the waterline to re- 
move any foreign particles that may 
be in the line.

 

NOTE:  

It is advisable to use a lime, scale, 

sediment, taste and odor purification char- 
coal water filter where water quality is a 
concern. 
3.  Connect waterline to inlet fitting on 

rear of the dispenser. Fitting may vary. 

4.  Turn on the water source to the 

dispenser. 

5.Turn the yellow knob to the ON position 

to allow water to flow through the urn. 

 

 

                      

 

Product Loading 

1.  Open the BIB along the perforated edges. 

Pull out the dispensing spout.   

2.  Remove the cap from the spout. 
3.  Connect the QCD as shown to 

dispensing spout. Scholle fitting screws 
onto BIB. 

Note:  THE FITMENT MUST BE PUSHED 
ALL THE WAY OUT SO THAT THE 
WORD “OUT” IS EXPOSED ON THE 
TOP OF THE FITMENT. 

 

 
 
 
 

4. Place the QCD into the neck of the 
    dispensing spout at the ridge as  
    shown on the illustration. 

 
 

 

Water 

On 

Water 

Off 

Ridge 

OUT 

Содержание 872DS

Страница 1: ...OR USE WITH BAG IN BOX The Post Mix Beverage Series utilizes a venturi valve to mix the syrup with the water 3650 New Town Blvd St Charles MO 63301 www newcocoffee com 636 925 1202 800 325 7867 MODEL...

Страница 2: ...fitting on rear of the dispenser Fitting may vary 4 Turn on the water source to the dispenser 5 Turn the yellow knob to the ON position to allow water to flow through the urn Product Loading 1 Open th...

Страница 3: ...it or when changing product Flush should be performed at least once a week Note Cleaning requires the use of a cleaning flush adapter An adapter may be purchased from Newco Enterprises Inc 320282 for...

Страница 4: ...sanitizer manufactures instructions Use 100 F water 7 Place BIB connector into the sanitizing solution Ensure connector is submerged to bottom 8 Place a large vessel under the faucet Lock or hold fauc...

Страница 5: ...t forget to clean sanitize faucet seat cup 7 Do follow all cleaning and sanitizing pro cedures remove and store concentrate if urn will not be used for an extended period of time ie more than two days...

Страница 6: ...product 1 Concentrate BIB empty 2 Product hose clogged 3 Product hose kinked 4 Check valve not seating 5 Adjustment screw in too far 1 Load new BIB 2 Clean product hose or replace 3 Check for kinks 4...

Страница 7: ...e Calibration For Post Mix Beverage Dispenser Remove Top Cover Remove Product And Hang Over Sides Of Dispenser Loosen Screw Slide Access Panel Toward Front And Remove After Access Panel Is Removed Adj...

Страница 8: ...xture Make small adjustments approximately 1 points or 1 8 turn at a time Replace Access Panel and Tighten Screw Replace Product Syrup Lines Top Cover To Adjust Flow Rate Rotate Adjustment Screw Clock...

Страница 9: ...Part No 803172 Issued 3 29 13 Rev 012015 9...

Страница 10: ...Part No 803172 Issued 3 29 13 Rev 012015 10...

Страница 11: ...al plate after the dial knob is removed This area is now open for cleaning and troubleshooting When reassembling dial knob to shaft be sure that the white indicator is in the same position as before I...

Отзывы: