background image

 
 

 

Section-7

 

 
 

www.newavenergy.com

 

 04-1206_S7_NW_OPMPS_10-50kVA_GB_110201.doc 

Page  4/4 

Printed in Switzerland – Modifications reserved

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

This page left intentionally blank 

 

Содержание PowerScale

Страница 1: ...ng the entire life cycle TCO Low input harmonic distortion Cost saving during installation Input Power Factor near unity Cost savings during installation and the entire life cycle TCO Compact size Flo...

Страница 2: ...a a SA Arturo Soria 329 1 D ES 28033 Madrid Tel 34 91 768 22 22 Fax 34 91 383 21 50 newave newave es www newave es Switzerland Newave Energy AG Industriestrasse 5 CH 5432 Neuenhof Switzerland Tel 41 5...

Страница 3: ...2 1 MECHANICAL CHARACTERISTICS POWERSCALE 10 15KVA CABINET A 1 2 2 MECHANICAL CHARACTERISTICS POWERSCALE 10 25KVA CABINET B 1 2 3 MECHANICAL CHARACTERISTICS POWERSCALE 30 50KVA CABINET C 1 2 4 GENERAL...

Страница 4: ...S 232 SUB D9 FEMALE AND USB PORT 3 1 2 CUSTOMER INTERFACE AND DRY PORTS TERMINALS X1 STANDARD 3 1 3 JR1 RS485 INTERFACE FOR MULTIDROP 4 SECTION 4 4 1 OPERATION 4 1 1 COMMISSIONING 4 1 2 CONTROL PANEL...

Страница 5: ...ECHNICAL CHARACTERISTICS 10 2 1 MECHANICAL CHARACTERISTICS POWERSCALE 10 15KVA CABINET A 10 2 2 MECHANICAL CHARACTERISTICS POWERSCALE 10 25KVA CABINET B 10 2 3 MECHANICAL CHARACTERISTICS POWERSCALE 30...

Страница 6: ...0 10 BATTERY AUTONOMIES 10 10 1 EXAMPLES OF BATTERY AUTONOMY AT FULL LOAD WITH STANDARD CABINETS AND STANDARD BATTERY CONFIGURATION 10 11 INSTALLATION PLANNING 10 11 1 HEAT DISSIPATION PER UPS RANGE W...

Страница 7: ...be done by the manufacturer s qualified technicians or their authorized service partners OPERATIONS INSIDE THE UPS MUST BE PERFORMED BY A SERVICE ENGINEER FROM THE MANUFACTURER OR FROM AN AGENT AUTHO...

Страница 8: ...e enhanced power performance parallel capability and connectivity s interaction When operating in parallel configuration each POWERSCALE can take the leadership role avoiding single points of failure...

Страница 9: ...ible Battery Management FBM 7 1 2 4 3 Feature DPA Technology Decentralized Parallel Architecture 7 1 2 5 QUALITY STANDARDS AND UPS CLASSIFICATION CODE 7 1 2 6 SINGLE PARALLEL CONFIGURATIONS 8 1 2 7 WA...

Страница 10: ...y other connection to the equipment A terminal to which or from which a direct current or voltage may be applied or supplied Three phase alternating current This symbol indicates the word phase ON The...

Страница 11: ...in these measures the operator of the USP System must adhere to the instructions in this manual Any deviations from the instructions could be dangerous to the user or cause accidental load loss NEWAV...

Страница 12: ...F Maximum Relative Humidity 95 non condensing The UPS cabinet uses forced air cooling to regulate internal component temperature Air inlets are in the bottom sides and front of the cabinet and outlets...

Страница 13: ...ine power failures 1 2 1 MECHANICAL CHARACTERISTICS POWERSCALE 10 20KVA CABINET A PowerScale Cabinet A Power range kVA 10 15 20 Dimensions WxHxD mm 345x720x710 Weight without battery kg 60 62 64 Weigh...

Страница 14: ...sensitive electronic equipment requires for reliable operation During brownouts blackouts and other power interruptions batteries provide emergency power to safeguard operation The UPS system is house...

Страница 15: ...ralized Parallel Architecture The UPS product features DPA paralleling technology that provides N X redundancy without introducing a single point of failure The products utilizing the DPA technology a...

Страница 16: ...d subsidiaries or distributors The warranty does not apply in any case of damage or loss caused by misuse negligence unauthorized repair or modification incorrect installation and commissioning inappr...

Страница 17: ...o not drop the equipment Do not either stack the pallets because of high energy batteries involved and the heavy weight NOTE IF THE UPS IS NOT IMMEDIATELY INSTALLED THE FOLLOWING GUIDELINES MUST BE FO...

Страница 18: ...ESTIGATION 1 3 3 UNPACKING Unpack the equipment by removing the packing and shipping materials Make a visual inspection and check that Tip Tel indicator FRAGILE and ARROW on the packing container is i...

Страница 19: ...ly be connected when the UPS is commissioned The battery life depends very much on the ambient temperature A temperature range between 18 and 23 C will achieve the optimum battery life If the UPS is d...

Страница 20: ...om the front and rear making it a service friendly and maintenance friendly UPS Reserve enough space from the front min 900 mm The UPS should be located where Humidity 90 non condensing and temperatur...

Страница 21: ...BETWEEN THE UPS AND THE EXTERNAL BATTERY CABINET S THE BATTERY CABINET IS CONNECTED ELECTRICALLY IN PARALLEL WITH THE INTERNAL BATTERIES OF THE UPS WARNING IF AVAILABLE THE INTERNAL BATTERY HAS TO BE...

Страница 22: ...YOU RUN RISK OF EXPOSURE TO DANGEROUS VOLTAGES PHYSICAL INJURY OR DEATH MAY FOLLOW OR DAMAGE MAY OCCUR TO THE UPS OR THE LOAD EQUIPMENT IF THESE INSTRUCTIONS ARE IGNORED To ensure correct operation of...

Страница 23: ...ide additional protection to the UPS in the event of overloads and short circuits 1 5 1 1 Mains Supply and Earth connection To ensure protection of personnel during the installation of UPS make sure t...

Страница 24: ...nput feed it is possible to use both terminals mains or bypass For minimum recommended Input Cable Sections and Fuse Ratings Section 2 chapter 2 1 3 Under the connection terminal of the UPS there is a...

Страница 25: ...MAINS INPUT CABLE UPS TERMINAL Rectifier BYPASS INPUT CABLE UPS TERMINAL Bypass Phase L1 1L1 Phase L1 2L1 Phase L2 1L2 Phase L2 2L2 Phase L3 1L3 Phase L3 2L3 NEUTRAL 1N NEUTRAL 2N EARTH PE EARTH PE F...

Страница 26: ...n distribution board is used sockets for Mains and UPS voltage ensure that on each socket there is an indication of the applied voltage Mains or UPS Output power cable ratings should be in accordance...

Страница 27: ...ery cabinet installation instructions have been completed Air conditioning equipment is installed and operating properly The area around the installed UPS system is clean and dust free It is recommend...

Страница 28: ...Section 1 www newavenergy com 04 1206_S1_NW_OPMPS_10 50kVA_GB_110201 doc Page 20 20 Printed in Switzerland Modifications reserved This page left intentionally blank...

Страница 29: ...le 10 20kVA in Cabinet A and Connection Terminals 4 2 2 2 FRONT AND REAR VIEW OF POWERSCALE CABINET B 5 2 2 2 1 Front and Rear View PowerScale 10 25kVA in Cabinet B and Connection Terminals 5 2 2 3 FR...

Страница 30: ...rview UPS Range Terminals T Connection Bar B Battery N PE Input Bypass 3 N N 2L1 2L2 2L3 Input Rectifier 3 N PE N 1L1 1L2 1L3 Output load 3 N PE N 3L1 3L2 3L3 Max cable section admissible Toghtening T...

Страница 31: ...E VERSION ON REQUEST DUAL INPUT FEED Power kVA Fuse B Agl CB Cable B IEC 60950 1 2001 Fuse C Agl CB Cable C IEC 60950 1 2001 Cable D IEC 60950 1 2001 Fuse E N Cable E N 10 3x20 5x2 5 3x20 4x2 5 5x2 5...

Страница 32: ...s detail see Section 3 1 2 6 JR1 RS485 on RJ 45 port Interface for Multidrop connection between several UPS cabinets see Section 3 7 SW1 9 Multi Cabinet Configuration Switch see section 4 8 JD8 Parall...

Страница 33: ...e Section 3 1 2 6 JR1 RS485 on RJ 45 port Interface for Multidrop connection between several UPS cabinets see Section 3 7 SW1 9 Multi Cabinet Configuration Switch see section 4 8 JD8 Parallel BUS conn...

Страница 34: ...port Interface for Multidrop connection between several UPS cabinets see Section 3 7 SW1 9 Multi Cabinet Configuration Switch see section 4 8 JD8 Parallel BUS connector Option ONLY For paralleling ca...

Страница 35: ...enclosures are shown NOTE Within the cabinets A B in only 7 9Ah batteries are allowed 16 48 blocks in Cabinet C also 28Ah batteries are allowed Cabinet A max 48 blocks Cabinet B max 96 blocks 2x48 blo...

Страница 36: ...ax 1 x 48 x 7 9Ah batteries Cabinet B max 2 x 48 x 7 9Ah batteries 20 blocs 22 blocs 24 blocs 20 blocs 22 blocs 24 blocs 6kW 8kW 9kW Powerscale 10kVA 9kW Load Power Autonomy min 7Ah batt 9Ah batt 7Ah...

Страница 37: ...2 x 38 1 x 48 2 x 48 2 x 40 2 x 48 10 2 x 34 1 x 48 2 x 46 2 x 32 3 x 40 2 x 40 3 x 46 2 x 46 12 2 x 40 2 x 28 2 x 48 2 x 36 3 x 44 2 x 44 3 x 48 2 x 48 13 3 x 48 2 x 48 n a 15 2 x 48 2 x 32 1 x 24 3...

Страница 38: ...W 16 blocs 20 blocs 24 blocs 28 blocs Powerscale 30kVA 27kW Load Power Autonomy min 7Ah batt 9Ah batt 28Ah batt 7Ah batt 9Ah batt 28Ah batt 7Ah batt 9Ah batt 28Ah batt 7Ah batt 9Ah batt 28Ah batt 6 2...

Страница 39: ...n a n a n a n a n a n a 20 n a n a n a n a n a n a n a n a n a n a n a n a 22 n a n a n a n a n a n a n a n a n a n a n a n a 24 n a n a n a n a n a n a n a n a n a n a n a n a 25 n a n a n a n a n a...

Страница 40: ...nsure protection of the personnel during the installation of the UPS make sure that the connections are performed under the following conditions No mains voltage is present in the UPS All the loads ar...

Страница 41: ...xternal battery If the UPS has to be configured with external batteries the internal battery link to the position of F1 Battery Fuse has to be replaced by the short Links delivered separately at the b...

Страница 42: ...Section 2 www newavenergy com 04 1206_S2_NW_OPMPS_10 50kVA_GB_110201 doc Page 14 14 Printed in Switzerland Modifications reserved This page left intentionally blank...

Страница 43: ...eserved SECTION 3 3 1 INTERFACING 2 3 1 1 SMART PORT JD1 SERIAL RS 232 SUB D9 FEMALE AND USB PORT 2 3 1 2 CUSTOMER INTERFACE AND DRY PORTS TERMINALS X1 STANDARD 3 3 1 2 1 Input Interfaces Terminal blo...

Страница 44: ...mote signalling and automatic computer shutdown SNMP Card slot already included SNMP card For monitoring and integration in network management 3 1 1 SMART PORT JD1 SERIAL RS 232 SUB D9 FEMALE AND USB...

Страница 45: ...12 Vdc source X1 9 IN 12Vdc Max 200mA load X1 8 GND GND Remote Shut down X1 7 IN 12Vdc Do not remove the factory mounted bridge until an external remote shut down is connected X1 6 GND GND Temperature...

Страница 46: ...t 2 Slot 1 Cabinet A B Slot 2 Slot 1 1 PMD Power Management Display PMD of POWERSCALE 2 USB PC Interface Slot 1 Option 3 JD1 RS232 Sub D9 female Interface UPS system to computer see section 3 1 1 4 X1...

Страница 47: ...s 3 4 1 2 3 Keys 3 4 1 2 4 ON OFF Start up and Shutdown Buttons 3 4 1 3 DESCRIPTION OF THE LCD 4 4 1 3 1 Status Screens 4 4 1 3 2 Main Menu Screen 4 4 1 3 3 Event Log Screen 5 4 1 3 4 Measurements Scr...

Страница 48: ...TURER 4 1 2 CONTROL PANEL WARNING ONLY PERSONS WHICH HAVE BEEN TRAINED BY SERVICE TECHNICIANS OF THE MANUFACTURER OR HIS AUTHORIZED SERVICE PARTNERS ARE ALLOWED TO OPERATE ON THE CONTROL PANEL WITH CL...

Страница 49: ...EEN RED OFF Mains bypass available Mains bypass not OK or not available UPS is turned off BY PASS GREEN OFF Load on bypass Bypass or Eco Mode Bypass not operating switched off INV GREEN RED OFF Load o...

Страница 50: ...by the UPS number The max no of module units are 2 per system EXEMPLES S stands for Single UPS The system consists of ONLY one UPS P1 stands for Parallel UPS in a Multi UPS system and 01 stands for t...

Страница 51: ...00 00 00 00 00 00 11 Active Output Power of all three phases ACTIVE POWER KW 00 00 00 00 00 00 12 Reactive Output Power of all three phases REACTIVE POWER kVAr 00 00 00 00 00 00 13 Apparent Output Pow...

Страница 52: ...LCD DISPLAY 1 Set up Language not active yet SET LANGUAGE SET DATE AND TIME ENGLISH FRANCAIS POLISH 2 Set up Date and Time SET UP DATE TIME SET UP BATT TEST DD MM YY HH MM SS 3 Set up battery test SE...

Страница 53: ...ruption to the static bypass mains supply transfer time 0 4 1 4 2 Mode OFF LINE ECO or BYPASS MODE In the OFF Line Mode the load is supplied from the mains through the static bypass Using the control...

Страница 54: ...F INVERTER RED Green BATTERY Green Green Before transferring the load to Maintenance Bypass IA1 always make sure all the UPS modules are in the Bypass Mode or ECO Mode NOTE ON OPERATION MODE MANUAL BY...

Страница 55: ...Printed in Switzerland Modifications reserved CONTENTS SECTION 5 5 1 OPERATION PROCEDURES 2 5 1 1 START UP PROCEDURE 2 5 1 2 SHUTDOWN PROCEDURE 4 5 1 3 LOAD TRANSFER FROM INVERTER OPERATION TO MAINTEN...

Страница 56: ...l battery enclosure fuses and or the external battery cabinets fuses are open 6 Bypass fuses F2 and rectifier fuses F1 are inserted Start up procedure of PowerScale 1 Insert fuses for the supply of UP...

Страница 57: ...N On output Terminal Block there is now UPS power and on all LCD s LOAD PROTECTED will appear now the two units are operating in parallel 13 Perform step 11 and 12 until all the unit of the system are...

Страница 58: ...n be completely shutdown The following procedures can only be executed after the load has completely been de energized NOTE IN THE CASE THAT THE PARALLEL UPS SYSTEM HAS TO BE TURNED OFF THEN BOTH ON O...

Страница 59: ...S and transfer the load to mains for parallel operation is enough to give the order in one of the units On LCD panel LOAD NOT PROTECTED will appear 2 Close Maintenance Bypass Switch IA1 position ON fo...

Страница 60: ...s LOAD OFF SUPPLY FAILURE will appear and the mimic panel will show LED Indicator Colour LINE 1 Green LINE 2 OFF BYPASS OFF INVERTER OFF BATTERY Flashing Green 3 Close all Parallel Isolators IA2 and...

Страница 61: ...ction of Parallel Communication Cables BUS lines 3 6 1 2 2 2 Parallel Adapter and DIP Switch SW2 2 4 6 1 2 3 DIP Switch SW1 9 Settings 4 6 1 2 4 DIP Switch SW1 9 4 6 1 2 5 ON OFF Main Buttons 5 6 1 2...

Страница 62: ...h off Every UPS unit in a parallel configuration is provided with a proper output parallel Isolator IA2 which when opened isolates the corresponding unit from the parallel system Once the parallel iso...

Страница 63: ...h single UPS it is necessary to connect the units together to form the parallel system For this purpose a communication BUS line is connected sequentially between the units Connect communication BUS l...

Страница 64: ...rrect positions 6 1 2 4 DIP Switch SW1 9 The DIP Switch SW1 9 is located on every Cabinet POWERSCALE With this switch it is possible to determine the position of an POWERSCALE Cabinet in a Multi Cabin...

Страница 65: ...IT ON WHICH ISOLATOR IA2 IS BEING CLOSED IS ALSO ON INVERTER 6 1 2 7 Maintenance Bypass IA1 There are two types of Parallel System Configurations redundant and capacity parallel systems see SECTION 5...

Страница 66: ...CALE Cabinets been set correctly according to Paragraphs 6 1 2 2 2 and 6 1 2 4 4 All the internal if any and or external battery cabinets racks have been connected correctly The start up of a parallel...

Страница 67: ...01 doc Page 1 4 Printed in Switzerland Modifications reserved CONTENTS SECTION 7 7 1 MAINTENANCE 2 7 1 1 INTRODUCTION 2 7 1 2 USER RESPONSIBILITIES 2 7 1 3 ROUTINE MAINTENANCE 2 7 1 4 BATTERY TEST 2 7...

Страница 68: ...reliability of the UPS are maximized When the UPS is commissioned the commissioning field service engineer will attach a service record book to the front of the UPS and this will be used to record th...

Страница 69: ...e battery maintenance shall be performed by a service engineer from the manufacturer or from an agent authorized by the manufacturer 7 1 6 BATTERY DISPOSAL AND RECYCLING Batteries contain dangerous su...

Страница 70: ...Section 7 www newavenergy com 04 1206_S7_NW_OPMPS_10 50kVA_GB_110201 doc Page 4 4 Printed in Switzerland Modifications reserved This page left intentionally blank...

Страница 71: ..._NW_OPMPS_10 50kVA_GB_110201 doc Page 1 2 Printed in Switzerland Modifications reserved CONTENTS SECTION 8 8 1 TROUBLESHOOTING 2 8 1 1 ALARMS 2 8 1 2 MENU COMMANDS EVENT LOG AND MEASUREMENTS 2 8 1 3 F...

Страница 72: ...input power to UPS is too low or missing If site power appears to be OK check the input circuit breakers etc supplying the UPS OUTPUT SHORT There is a short circuit at the output of UPS on load side...

Страница 73: ...TIONS 2 9 1 1 INTRODUCTION 2 9 1 2 REMOTE SHUT DOWN 2 9 1 3 GENERATOR ON FACILITIES 3 9 1 4 WAVEMON SHUTDOWN AND MANAGEMENTSOFTWARE 3 9 1 4 1 Why is UPS Management important 3 9 1 4 2 WAVEMON Shutdown...

Страница 74: ...down procedure is disabled and it should be activated by a Hardware Code on Setup Service menu Please contact your distributor to enable this operation The remote shutdown on terminal port X1 7 X1 8 i...

Страница 75: ...low state In the event of a power disturbance system administrators can also monitor their network from a central location allowing an early detection of problems In fact utility power is unreliable a...

Страница 76: ...rv collects messages received from the UPS The UPSServ interprets received messages and makes them available to the client module UPSCli and to any SNMP based management station When UPSServ detects v...

Страница 77: ...P CARD ADAPTER FOR NETWORK MANAGEMENT REMOTE MONITORING The Simple Network Management Protocol SNMP is a worldwide standardized communication protocol It is used to monitor any device in the network v...

Страница 78: ...network The new release RCCMD2 is an application available for all Operating Systems analogous to PMC Software Our SNMP Interfaces are compatible to RCCMD 9 1 6 MODEM ETHERNET CARD NEWAVEWATCH MANAGE...

Страница 79: ...alysis and diagnostics report Visualization of the UPS data Current status single and parallel operation Measured values for single or three phase Recording function including graphs with zooming capa...

Страница 80: ...Section 9 www newavenergy com 04 1206_S9_NW_OPMPS_10 50kVA_GB_110201 doc Page 8 8 Printed in Switzerland Modifications reserved This page left intentionally blank...

Страница 81: ...e life cycle TCO Low input harmonic distortion Cost saving during installation Input Power Factor near unity Cost savings during installation and the entire life cycle TCO Compact size Floor space cos...

Страница 82: ...C EFFICIENCY with Linear load up to cos 1 8 10 6 ENVIRONMENTAL CHARACTERISTICS 9 10 7 STANDARDS 9 10 8 COMMUNICATION 10 10 8 1 POWER MANAGEMENT DISPLAY PMD 10 10 8 2 MIMIC DIAGRAM 10 10 8 3 DISPLAY 10...

Страница 83: ...e enhanced power performance parallel capability and connectivity s interaction When operating in parallel configuration each POWERSCALE can take the leadership role avoiding single points of failure...

Страница 84: ...WxHxD mm 345x720x710 Weight without battery kg 60 62 64 Weight with battery with 48 block of 7Ah kg 180 182 184 with standard packaging kg 4 Colour Graphite grey RAL 7024 10 2 2 MECHANICAL CHARACTERIS...

Страница 85: ...40 50 Nominal Input Voltage V 3x380 220V N 3x400V 230V N 3x415 240V N Input Voltage Tolerance ref to 3x400 230V for Loads in V 23 15 3x308 177 V to 3x460 264 V for 100 load 30 15 3x280 161 V to 3x460...

Страница 86: ...ved 10 3 1 GRAPH INPUT PF VERSUS LOAD Input Power factor Leading 0 96 0 985 0 99 0 99 0 0 2 0 4 0 6 0 8 1 25 50 75 100 Load Input Power Factor 10 3 2 GRAPH INPUT DISTORTION THDi VERSUS LOAD Input Curr...

Страница 87: ...ies is 50 Description Cabinet Type Maximum Power in kW 6 8 9 6 8 9 8 10 12 13 5 8 10 12 13 5 9 12 16 18 9 12 16 18 12 16 20 22 5 Minimum number of battery blocks per String 20 22 24 16 22 24 22 28 32...

Страница 88: ...Load 2 With Non linear Load EN62040 3 2001 4 Output Frequency Hz 50 Hz or 60 Hz Output Frequency Tolerance Synchronized with mains 2 selectable for bypass operation or 4 Free running 0 1 Bypass opera...

Страница 89: ...ng Factor for Power 1500 4850 0 95 2000 6600 0 91 2500 8250 0 86 De rating factor for use at altitudes above 1000m sea level according IEC 62040 3 3000 9900 0 82 Relative Air humidity Max 95 non conde...

Страница 90: ...10 8 2 MIMIC DIAGRAM The mimic diagram serves to give the general status of the UPS The LED indicators show the power flow status and in the event of mains failure or load transfer from inverter to b...

Страница 91: ...unction X1 10 GND GND 12 Vdc source X1 9 IN 12Vdc Max 200mA load X1 8 GND GND Remote Shut down X1 7 IN 12Vdc Do not remove the factory mounted bridge until an external remote shut down is connected X1...

Страница 92: ...zed communication protocol It is used to monitor any device in the network via simple control language The UPS Management Software WaveMon also provides its data in this SNMP format with its internal...

Страница 93: ...abinet A max 1 x 48 x 7 9Ah batteries Cabinet B max 2 x 48 x 7 9Ah batteries 20 blocs 22 blocs 24 blocs 20 blocs 22 blocs 24 blocs 6kW 8kW 9kW Powerscale 10kVA 9kW Load Power Autonomy min 7Ah batt 9Ah...

Страница 94: ...2 x 38 1 x 48 2 x 48 2 x 40 2 x 48 10 2 x 34 1 x 48 2 x 46 2 x 32 3 x 40 2 x 40 3 x 46 2 x 46 12 2 x 40 2 x 28 2 x 48 2 x 36 3 x 44 2 x 44 3 x 48 2 x 48 13 3 x 48 2 x 48 n a 15 2 x 48 2 x 32 1 x 24 3...

Страница 95: ...kW 16 blocs 20 blocs 24 blocs 28 blocs Powerscale 30kVA 27kW Load Power Autonomy min 7Ah batt 9Ah batt 28Ah batt 7Ah batt 9Ah batt 28Ah batt 7Ah batt 9Ah batt 28Ah batt 7Ah batt 9Ah batt 28Ah batt 6 2...

Страница 96: ...n a n a n a n a n a n a 20 n a n a n a n a n a n a n a n a n a n a n a n a 22 n a n a n a n a n a n a n a n a n a n a n a n a 24 n a n a n a n a n a n a n a n a n a n a n a n a 25 n a n a n a n a n a...

Страница 97: ...in 200 mm rear space required for fan Input and Output Power Cabling From the bottom on the rear side 10 11 1 HEAT DISSIPATION PER UPS RANGE WITH NON LINEAR LOAD UPS Range 10kVA 15kVA 20kVA 25kVA 30kV...

Страница 98: ...TIONS OVERVIEW UPS Range Terminals T Connection Bar B Battery N PE Input Bypass 3 N N 2L1 2L2 2L3 Input Rectifier 3 N PE N 1L1 1L2 1L3 Output load 3 N PE N 3L1 3L2 3L3 Max cable section admissible Tog...

Страница 99: ...ERSION ON REQUEST DUAL INPUT FEED Power kVA Fuse B Agl CB Cable B IEC 60950 1 2001 Fuse C Agl CB Cable C IEC 60950 1 2001 Cable D IEC 60950 1 2001 Fuse E N Cable E N 10 3x20 5x2 5 3x20 4x2 5 5x2 5 3x3...

Отзывы: