2-102
Issued 11-06
Bur
87519804 NA
CHAPTER 2 - 667TA ENGINE OVERHAUL
ENGINE REPAIR MANUAL
ENGINE FLYWHEEL
BS06K329
Figure 2-202
A. ENGINES: 667TA/EEG - 667TA/EEC
B. ENGINES: 667TA/EBF - 667TA/EED -667TA/EDJ
C. ENGINES: 667TA/EED - 667TA/EBD
REPLACING ENGINE FLYWHEEL RING GEAR
STEP 101
Check the condition of ring gear teeth. If breaks or
excessive tooth wear is found, remove the ring gear
from the engine flywheel by using appropriate beater.
Then install the new gear ring after heating it to
150° C (302° F) for 15 to 20 minutes. Chamfering on
the ring gear must face the engine flywheel.
STEP 102
BS06K330
Figure 2-203
Screw two pins (2) of suitable length into the shaft
holes (3), then remove the engine flywheel (1) by
means of suitable harness and a hoist.
STEP 103
BS06K331
Figure 2-204
Apply tool (2), except for (667TA/EEG - 667TA/EEC
engines) to the flywheel case (1) to stop engine
flywheel (3) rotation.
Tighten bolts (4) fastening engine flywheel (3) to the
crankshaft.
STEP 104
BS06K332
Figure 2-205
Tighten engine flywheel (2) fastening bolts (1) in two
separate phases.
•
1st phase- tighten to a torque of 26 to 34 Nm
(19 to 25 lbf ft.)
•
2nd phase- Tighten to 60° ± 5°
C
B
A
2
1
3
1
2
3
4
2
1
Содержание 667TA/EBF
Страница 4: ...SECTION 1 ENGINE REPAIR MANUAL II Issued 11 06 Bur 87519804 NA NOTES ...
Страница 8: ...1 2 Issued 11 06 Bur 87519804 NA CHAPTER 1 DIAGNOSTICS ENGINE REPAIR MANUAL NOTES ...
Страница 16: ...1 10 Issued 11 06 Bur 87519804 NA CHAPTER 1 DIAGNOSTICS ENGINE REPAIR MANUAL NOTES ...
Страница 22: ...2 4 Issued 11 06 Bur 87519804 NA CHAPTER 2 667TA ENGINE OVERHAUL ENGINE REPAIR MANUAL NOTES ...
Страница 144: ...3 2 Issued 11 06 Bur 87519804 NA CHAPTER 3 CHARGING AND START UP ENGINE REPAIR MANUAL NOTES ...
Страница 150: ...3 8 Issued 11 06 Bur 87519804 NA CHAPTER 3 CHARGING AND START UP ENGINE REPAIR MANUAL NOTES ...