The needing attentions before reading the manual
Please read this manual carefully before doing the installation
This heat pump water heater must be installed by the professional technical
personnel.
Please install the machine and connect the water pipe in accordance with this
manual strictly.
For safety, please make sure to recheck everything is well before power on.
If the machine has any improvement, the content is subject to change without
notice.
1
Please read this manual carefully before installation and operation.
Please keep this manual for future reference.
Applicable models:
NERS-B1.0S-P
、
NERS-B1.5S-P
、
Ⅰ.
Prologue
············································································································································
2
II. Model and Specification
············································································································
3
Ⅲ
Explosive view
···························································································································· ····
4
Ⅳ
Installation
········································································································································
6
Ⅴ
Trial running /commissioning
·······························································································
9
Ⅵ
Display and operation of wired controller
·····································································
10
Ⅶ
Maintenance
·····································································································································
19
Ⅷ
Wiring diagram
······························································································································
20
NERS-B2.0S-P
NERS-B3.0S-P
Содержание NERS-B1.0S-P
Страница 1: ...COMMERCIAL UNIT NEW ENERGY ...
Страница 22: ......