Page 24
ASH REMOVAL
INSTRUCTIONS
(3)
DUMP CHANNEL.
SWEEP ASHES INTO ASH
ASH DUMP TOP LID AND
REAR OF HEATER. OPEN
DUMP TOP LID IN RIGHT
FIRE BOX. LOCATE ASH
OPEN MAIN DOOR TO
(4)
BE PLACED ON A NON COMBUSTIBLE FLOOR
UP TO 72 HOURS AFTER REMOVAL.
THOROUGHLY COOLED. ASHES CAN IGNITE
CONTAINER UNTIL ASH CINDERS HAVE
SHOULD BE RETAINED IN THE CLOSED
OTHERWISE LOCALLY DISPERSED, THEY
DISPOSED OF BY BURIAL IN SOIL OR
FINAL DISPOSAL. IF THE ASHES ARE
ALL COMBUSTIBLE MATERIALS, PENDING
OR ON THE GROUND, WELL AWAY FROM
CLOSED CONTAINER OF ASHES SHOULD
WITH A TIGHT FITTING LID. THE
BE PLACED IN A METAL CONTAINER
DISPOSAL OF ASHES: ASHES SHOULD
NOTE:
OF ASHES PROPERLY.
FROM PEDESTAL AND DISPOSE
OF REAR NOTCH. REMOVE PAN
LID AND LIFT ASH PAN OUT
WHEN FINISHED, CLOSE TOP
(4)
NOTE: IF HEATER IS EQUIPPED WITH OPTIONAL ROOM BLOWER BE
SURE TO TURN BLOWER OFF BEFORE REMOVING ASHES
TURN BLOWER ON.
REPLACE ASH PAN IN PEDESTAL.
(6)
(5)
(5)
(6)
ASH DUMP
CHANNEL
Содержание FS 21
Страница 2: ......
Страница 28: ...Page 26 STEP 1 STEP 2 STEP 3 WIRE DIAGRAM...